Open Access
Issue
E3S Web Conf.
Volume 139, 2019
Rudenko International Conference “Methodological problems in reliability study of large energy systems” (RSES 2019)
Article Number 01003
Number of page(s) 5
DOI https://doi.org/10.1051/e3sconf/201913901003
Published online 16 December 2019
  1. Belyaev L.S., Voropai N. I., Koshcheev L. A. Prospects for development of interstate grids in the Eurasia supercontinent. Proceedings of the Russian Academy of Sciences. Energy, no. 2, pp. 27-35. (2000) [in Russian] [Google Scholar]
  2. Barinov V.A., Bushuev V.V., Samorodov G.I. Structural and technological foresight of UPS development in Russia and infrastructure of Eurasia. Energy Policy, no. 3, pp. 43-40 (2014) [in Russian] [Google Scholar]
  3. Voropai N. I., Podkovalnikon S.V., Saveliev V.A., Chudinova L.Yu. Interstate grids of Eurasia and their interconnection with UPS of Russia. Electric power. Transmission and distribution, no. 3, p. 8-13. (2017) [in Russian] [Google Scholar]
  4. Voropai N. I., Podkovalnikon S.V., Saveliev V.A., Chudinova L.Yu. Effectiveness of interstate electric ties. Novosibirsk, Science, 239 p. (2008) [in Russian] [Google Scholar]
  5. Scheme and Program of Unified Energy System of Russia development for 2019-2025. RF Ministry of Energy, 273 p. [Electronic resource]. Access mode: https://minenergo.gov.ru/system/download-pdf/14828/97146. (2019) [in Russian] [Google Scholar]
  6. General layout of power facilities in Russia for the period up to 2035. RF Ministry of Energy, 277 p. [Electronic resource]. Access mode:https://minenergo.gov.ru/system/download-pdf/14828/97146. (2017) [in Russian] [Google Scholar]
  7. Ten Year Network Development Plan of Georgia 2019-2029. Georgian State Electric System, 2019. 438 p. [Electronic resource]. Access mode:http://www.gse.com.ge/sw/static/file/TYNDP_GE-2019-2029_ENG.pdf. (2019) [Google Scholar]
  8. Electricity Demand Forecast: Based on Multiple Regression Analisis. Period 2014 to 2037. National Transmission & Despatch Company. 111 p. [Electronic resource]. Access mode:http://www.ntdc.com.pk/planning. (2014) [Google Scholar]
  9. A concept of Kazakhstan Fuel and Energy Complex development till 2030 (Decree of Kazakhstan Republic dated 28/06/2014, no. 724). [Electronic resource]. Access mode: http://adilet.zan.kz/rus/docs/P1400000724. (2014) [in Russian] [Google Scholar]
  10. Forecast balance of capacity and power of Kazakhstan EPS for the period to 2019-2025. Kazakhstan Electric Energy Management Company, 7 p. [Electronic resource]. Access mode: https://www.kegoc.kz. (2019) [in Russian] [Google Scholar]
  11. Abtin Ataei, Khaled Fararian. Environmental and Economic Analysis of Scenarios for Transition to Renewable Energy in the Iranian Electricity Supply System. International Journal of Energy Science and Engineering, no 4 (1), pp. 153-162. (2015) [Google Scholar]
  12. Central Asia Regional Economic Cooperation: Power Sector Regional Master Plan. Asian Development Bank, 65 p. [Electronic resource]. Access mode: https://www.adb.org. (2012) [Google Scholar]
  13. Update of the Power Sector Master Plan of Azerbaijan 2013 - 2025. 48 p. [Electronic resource]. Access mode: http://www.inogate.org/documents. (2013) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.