Open Access
Issue
E3S Web Conf.
Volume 139, 2019
Rudenko International Conference “Methodological problems in reliability study of large energy systems” (RSES 2019)
Article Number 01013
Number of page(s) 5
DOI https://doi.org/10.1051/e3sconf/201913901013
Published online 16 December 2019
  1. T. Dyatel Kommersant newspaper 143, 1 (2019) [Google Scholar]
  2. Government of the Russian Federation. (2019, Mar. 20), N. 287, On Amendments to Certain Acts of the Government of the Russian Federation on meeting the needs of the authorities in ensuring the unified energy system of Russia, as well as improving the price dependent mechanism for reducing energy consumption and providing energy supply services system reliability [Google Scholar]
  3. EnergyNet national technology initiative roadmap [Online]. Available: http://www.nti2035.ru/markets/docs/DK_energynet.pdf (Accessed on: Jul. 20, 2019) [Google Scholar]
  4. The system operator familiarized electricity consumers with the prospects of introducing demand management technologies in the retail market [Online]. Available: http://www.odusv.so-cdu.ru/index.php?id=dr_news_view&tx_ttnews[tt_news]=12768&cHash=0133b4a449 (Accessed on: Jul.28, 2019) [Google Scholar]
  5. N. Sidorova Energorynok 132, 28-32 (2015) [Google Scholar]
  6. Peak Load Management Alliance “Demand Response Acronyms & Glossary. Training Course Resource” [Online]. Available: https://www.peakload.org/assets/PLMADR%20_AcronymsGlossary_053117.pdf (Accessed on: Jul. 10, 2019) [Google Scholar]
  7. Global Demand Response Capacity is Expected to Grow to 144 GW in 2025 [Online]. Available: https://www.navigantresearch.com/news-and-views/global-demand-response-capacity-is-expected-to-grow-to-144-gw-in-2025 (Accessed on: Jul. 05, 2019) [Google Scholar]
  8. F. Opadchiy, D. Holkin Demand management in the Russian Power Engineering: opportunities: expert and analytical report [Online]. Available: https://onedrive.live.com/?authkey=%21AL1vFI6tP9alF9E&cid=7589EC31D3F642F1&id=7589EC31D3F642F1%218910&parId=7589EC31D3F642F1%217875&o=OneUp (Accessed on: Jul. 13, 2019) [Google Scholar]
  9. Notification of competitive selection for electricity demand management services [Online]. Available: https://so-ups.ru/fileadmin/files/company/markets/dr/notice/notice_dr_110619-1.pdf (Accessed on: Jun. 26, 2019) [Google Scholar]
  10. Decisions of the commission on selection of power engineering entities providing demand management services [Online]. Available: https://so-ups.ru/?id=markets_asm_com_dr_dec (Accessed on: Jul. 06, 2019) [Google Scholar]
  11. First selection of market participants in demand management in Russia: results and conclusions [Online]. Available: https://medium.com/internet-of-energy/rus-demand-response-b2621247548a (Accessed on: Jul. 27, 2019) [Google Scholar]
  12. F. Byk, L. Myshkina Rudenko International Conference “Methodological problems in reliability study of large energy systems”, 69 book 2, 81-88(Irkutsk, 2018) [Google Scholar]
  13. Government of the Russian Federation (2009, Dec. 31), N 1220, About definition of the long-term rates of reliability indicators and quality of the delivered goods and the rendered services applied at establishment [Google Scholar]
  14. P. Ilyushin Electro, Electrotechnics, power engineering, electrotechnical industry 4, 19-25 (2011) [Google Scholar]
  15. E. N. Gezha, V. E. Glazyrin, G. V. Glazyrin, A. I. Marchenko, R. Iu. Semendiaev, A. G. Fishov [etc.] Releishchik 2, 24-31 (2018) [Google Scholar]
  16. Conception Digital Transformation 2030 [Online]. Available: http://www.rosseti.ru/investment/Kontseptsiya_Tsifrovaya_transformatsiya_2030.pdf (Accessed on: May 05, 2019) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.