Open Access
Issue
E3S Web Conf.
Volume 166, 2020
The International Conference on Sustainable Futures: Environmental, Technological, Social and Economic Matters (ICSF 2020)
Article Number 02006
Number of page(s) 8
Section Geotechnical and Geoenvironmental Engineering
DOI https://doi.org/10.1051/e3sconf/202016602006
Published online 22 April 2020
  1. V. Kalinichenko, S. Pysmennyi, N. Shvaher, O. Kalinichenko, E3S Web of Conf. 60, 00041 (2018). doi:10.1051/e3sconf/20186000041 [Google Scholar]
  2. M. Stupnik, V. Kalinichenko, in Annual ScientificTechnical Colletion – Mining of Mineral Deposits 2013, pp. 49–52 [Google Scholar]
  3. O. Khomenko, A. Sudakov, Z. Malanchuk, Ye. Malanchuk, Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu 2, 35–43 (2017) [Google Scholar]
  4. M. Petlovanyi, V. Lozynskyi, S. Zubko, P. Saik, K. Sai, Rudarsko Geolosko Naftni Zbornik 34(1), 83–91 (2019). doi:10.17794/rgn.2019.1.8 [Google Scholar]
  5. M.I. Stupnik, V.O. Kalinichenko, S.V. Pysmennyi, O.V. Kalinichenko, Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu 4, 21–27 (2018). doi:10.29202/nvngu/2018-4/4 [CrossRef] [Google Scholar]
  6. N. Stupnik, V. Kalinichenko, Geomechanical Processes During Underground Mining, in Proceedings of the School of Underground Mining (2012), pp. 15–17 [Google Scholar]
  7. O. Kalinichenko, M. Fedko, I. Kushnerov, M. Hryshchenko, E3S Web of Conf. 123, 01015 (2019). doi:10.1051/e3sconf/201912301015 [CrossRef] [EDP Sciences] [Google Scholar]
  8. N.I. Stupnik, V.A. Kalinichenko, M.B. Fedko, Ye.G. Mirchenko, Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu 2, 11–16 (2013) [Google Scholar]
  9. N.I. Stupnik, V.A. Kalinichenko, M.B. Fedko, Ye.G. Mirchenko, Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu 1, 44–48 (2013) [Google Scholar]
  10. M.I. Stupnіk, V.O. Kalіnіchenko, O.V. Kalіnіchenko, I.O. Muzika, M.B. Fed’ko, S.V. Pismennyi, Metal. and Min. Ind. 7, 377–383 (2015) [Google Scholar]
  11. M. Stupnik, V. Kolosov, V. Kalinichenko, S. Pismennyi, in Progressive Technologies of Coal, Coalbed Methane, and Ores Mining (2014), pp. 25–30. doi:10.1201/b17547 [Google Scholar]
  12. O. Khomenko, M. Kononenko, M. Petlyovanyy, in Progressive Technologies of Coal, Coalbed Methane, and Ores Mining (2014), pp. 241–245. doi:10.1201/b17547-43 [CrossRef] [Google Scholar]
  13. M. Petlovanyi, V. Lozynskyi, P. Saik, K. Sai, E3S Web of Conf. 123, 01019 (2019). doi:10.1051/e3sconf/201912301019 [CrossRef] [EDP Sciences] [Google Scholar]
  14. Z.R. Malanchuk, V.S. Moshynskyi, V.Ya. Korniienko, Ye.Z. Malanchuk, V.H. Lozynskyi, Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu 6, 11–18 (2019). doi:10.29202/nvngu/2019-6/2 [Google Scholar]
  15. V. Serhiienko, E3S Web of Conf. 109, 00084 (2019). doi:10.1051/e3sconf/201910900084 [Google Scholar]
  16. N. Morkun, T. Oliinyk, I. Kasatkina, O. Rytsko, E3S Web of Conf. 123, 01038 (2019). doi:10.1051/e3sconf/201912301038 [CrossRef] [Google Scholar]
  17. V. Tron, O. Tsokurenko, D. Paraniuk, I. Haponenko, E3S Web of Conf. 123, 01037 (2019). doi:10.1051/e3sconf/201912301037 [CrossRef] [EDP Sciences] [Google Scholar]
  18. V. Morkun, N. Morkun, A. Pikilnyak, Metal. and Min. Ind. 6(2), 36–42 (2014) [Google Scholar]
  19. V. Golik, V. Komashchenko, V. Morkun, Metal. and Min. Ind. 7(4), 321–324 (2015) [Google Scholar]
  20. V. Golik, V. Komashchenko, V. Morkun, O. Burdzieva, Metal. and Min. Ind. 7(6), 591–594 (2015) [Google Scholar]
  21. A. Kupin, D. Kuznetsov, I. Muzyka et al, East.European J. of Enterprise Tech. 4, 2(94), 71–79 (2018) [Google Scholar]
  22. D.V. Brovko, V.V. Khvorost, V.Yu. Tyshchenko, Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu 4, 66–71 (2018). doi:10.29202/nvngu/2018-4/14 [CrossRef] [Google Scholar]
  23. V. Morkun, N. Morkun, A. Pikilnyak, Metal. and Min. Ind. 6(2), 43–48 (2014) [Google Scholar]
  24. O. Khomenko, M. Kononenko, M. Petlovanyi, in New Developments in Mining Engineering 2015 (2015), pp. 265–269. doi:10.1201/b19901-47 [Google Scholar]
  25. V. Lozynskyi, P. Saik, M. Petlovanyi, K. Sai, Z. Malanchuk, Intern. J. of Eng. Res. in Africa 35 (2018). doi:10.4028/www.scientific.net/jera.35.77 [Google Scholar]
  26. S. Dineva, M. Boskovic, in Proceedings of the Eighth International Conference on Deep and High Stress Mining, ed. by J. Wesseloo (Australian Centre for Geomechanics, 2017), pp. 125–139 [CrossRef] [Google Scholar]
  27. Y. Biruk, H. Mwagalanyi, Master’s thesis. Department of Civil, Environmental and Natural Resources Engineering 74 (2010) [Google Scholar]
  28. K. Rysbekov, D. Huayang, T. Kalybekov, M. Sandybekov, K. Idrissov, Y. Zhakypbek, G. Bakhmagambetova, Min. of Miner. Dep. J. 13, 3, 40–48 (2019). doi:10.33271/mining13.03.040 [Google Scholar]
  29. O. Khomenko, M. Kononenko, I. Kovalenko, D. Astafiev, E3S Web of Conf. 60, 00009 (2018). doi:10.1051/e3sconf/20186000009 [Google Scholar]
  30. M. Petlovanyi, O. Kuzmenko, V. Lozynskyi, V. Popovych, K. Sai, P. Saik, Min. of Miner. Dep. J. 13, 1, 24–38 (2019). doi:10.33271/mining13.01.024 [Google Scholar]
  31. T. Kalybekov, M. Sandibekov, K. Rysbekov, Y. Zhakypbek, E3S Web of Conf. 123, 01004 (2019). doi:10.1051/e3sconf/201912301004 [Google Scholar]
  32. B.M. Andreev, D.V. Brovko, V.V. Khvorost, Metal. and Min. Ind. 12, 378–382 (2015) [Google Scholar]
  33. V. Dengub, V. Shapovalov, M. Hudyk, Metal. and Min. Ind. 5, 67–71 (2015) [Google Scholar]
  34. V. Morkun, N. Morkun, V. Tron, Metal. and Min. Ind. 7(8), 18–21 (2015) [Google Scholar]
  35. V. Tron, O. Tsokurenko, D. Paraniuk, I. Haponenko, E3S Web of Conf. 123, 01037 (2019). doi:10.1051/e3sconf/201912301037 [CrossRef] [EDP Sciences] [Google Scholar]
  36. V.R. Imenitov, Protsessy podzemnykh gornykh rabot pri razrabotke rudnykh mestorozhdeniy (Underground mining processes in the development of ore deposits). (Nedra, Moskva, 1984) [Google Scholar]
  37. Yu.P. Kaplenko, V.A. Kolosov, Instruktivnometodicheskiye ukazaniya po vyboru parametrov burovzryvnykh rabot (BVR) pri podzemnoy dobyche rud. CH. I. Vybor parametrov BVR pri provedenii vyrabotok (Guidance on the selection of parameters for drilling and blasting operations (BWR) in underground ore mining. Choice of BVR parameters during mine workings) (Mineral, Krivoy Rog, 2007) [Google Scholar]
  38. R.O. Dychkovskyi, V.H. Lozynskyi, P.B. Saik, M.V. Petlovanyi, Y.Z. Malanchuk, Z.R. Malanchuk, Archives of Civil and Mechanical Engineering 18(4), 1183–1197 (2018). doi:10.1016/j.acme.2018.01.012 [CrossRef] [Google Scholar]
  39. V. Morkun, N. Morkun, V. Tron, Metal. and Min. Ind. 7(10), 6–9 (2015) [Google Scholar]
  40. M.I. Agoshkov, S.S. Borisov, V.A. Boyarskiy, Razrabotka rudnykh i nerudnykh mestorozhdeniy (Development of ore and non-metallic deposits). (Nedra, Moskva, 1983) [Google Scholar]
  41. V. Morkun, N. Morkun, V. Tron, S. Hryshchenko, O. Serdiuk, I. Dotsenko, Archives of Acoustics 44(1), 161–167 (2019) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.