Open Access
Issue |
E3S Web Conf.
Volume 185, 2020
2020 International Conference on Energy, Environment and Bioengineering (ICEEB 2020)
|
|
---|---|---|
Article Number | 01011 | |
Number of page(s) | 6 | |
Section | Energy Engineering and Power System | |
DOI | https://doi.org/10.1051/e3sconf/202018501011 | |
Published online | 01 September 2020 |
- Li, K. (2019) Research on project management of foreign power transmission and transform- ation projects. Engineering Construction and Design,14:224–25. [Google Scholar]
- Yan, H. (2017) Risk management of power engineering EPC general contracting project with design as the leader. Nanchang University, Nanchang. [Google Scholar]
- Lin, Z. M., Zhang, W., Hou, X. L. (2015) Comprehensive evaluation of power transmission and transformation engineering management process system under EPC mode. Power System and Clean Energy, vol 31(10):89–93. [Google Scholar]
- Zhang, L. M. (2015) Research on owner management interface of power transmission and transformation project based on EPC mode. North China Electric Power University, Beijing. [Google Scholar]
- Zhang, C. J. (2015) Research on EPC General Contract Management of Power Transmission and Transformation Engineering in Electric Power Design Institute. North China Electric Power University, Beijing. [Google Scholar]
- Zhong, Y. (2014) Research on EPC project management optimization of power transmission and transformation project in China. Enterprise Research, 18:40–46. [Google Scholar]
- Lan, B., Yin, H. (2012) Research on project management of power transmission and transfor- mation project under EPC mode. Project Management Technology, vol 10 (12): 25–29. [Google Scholar]
- Xie, P. F. (2014) Research on the suitability of EPC mode for power transmission and transformation engineering of Group A. North China Electric Power University, Beijing. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.