Open Access
Issue |
E3S Web Conf.
Volume 198, 2020
2020 10th Chinese Geosynthetics Conference & International Symposium on Civil Engineering and Geosynthetics (ISCEG 2020)
|
|
---|---|---|
Article Number | 03017 | |
Number of page(s) | 4 | |
Section | Exploration and Innovation of Construction Engineering Technology | |
DOI | https://doi.org/10.1051/e3sconf/202019803017 | |
Published online | 26 October 2020 |
- Zhou S.L. (2019) Practical application of BIM technology in prefabricated housing-a case study of a indemnificatory housing project. Guangdong Building Materials, 35:77-79. [Google Scholar]
- Xiong S.W., Zhou C.F. (2019) Application of BIM technology in prefabricated residential buildings. Chinese Construction, 2:136-137. [Google Scholar]
- Yan Y.Wn. Research on the application of BIM technology in prefabricated houses. House, 3:76-78. [Google Scholar]
- Ma H. (2018) On the application of BIM technology in prefabricated housing design. Housing Industry, 11: 55-57. [Google Scholar]
- Zou T.T. (2018) Research on the application of BIM technology in prefabricated housing. Intelligent Building and Smart City, 4: 59-61. [Google Scholar]
- Zheng X.D. (2018) Application of BIM Technology in prefabricated residential design [J]. Housing and Real Estate, 12: 81-83. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.