Open Access
Issue
E3S Web Conf.
Volume 209, 2020
ENERGY-21 – Sustainable Development & Smart Management
Article Number 07012
Number of page(s) 6
Section Session 6. Power Quality
DOI https://doi.org/10.1051/e3sconf/202020907012
Published online 23 November 2020
  1. L.I. Kovernikova, V.V. Sudnova, R.G. Shamonov, et al., Power quality: present-day state, problems and proposals to their solutions (Nauka, 2017) [Google Scholar]
  2. Federal Law of the Russian Federation No. 35-RF “On the Electric Power Industry” of March 26, 2003 [Google Scholar]
  3. Rules for connecting consumers to a general-purpose network on the terms of influence on the power quality, Industrial Power Engineering, No. 8, 45-48 (1991) [Google Scholar]
  4. Rules for applying discounts and surcharges to tariffs for the power quality, Industrial Power Engineering, No. 8, 49-51 (1991) [Google Scholar]
  5. Price list No. 09-01. Electricity and heat rates (M .: Preiskurantizdat, 1990) [Google Scholar]
  6. L.I. Kovernikova, A.V. Serkov A.V., R.G. Shamonov, Electricity quality control in Russia, Operational Control in the Electric Power Industry. Personnel Training and Maintenance of their Qualifications, No. 1, 48-61 (2019) [Google Scholar]
  7. Zabaikalsky Rabochy newpaper “Emergency state was introduced in the Mogochinsky district due to failure of 17 engines and a pump in boiler rooms”, http://zabrabochy.rf/news/189133/ [Google Scholar]
  8. JSC “Mining and ore company “Zapadnaya””, http://www.zapadnaya.ru [Google Scholar]
  9. Contract No. 110418 dated April 26, 2011, between Outotec (Finland) Oy (Espoo, Finland) and Closed Joint Stock Company “Aleksandrovsky Mine”. [Google Scholar]
  10. TOMS Group of Companies, http://www.tomsgroup.ru/ [Google Scholar]
  11. Power supply agreement No. 050641 dated January 15, 2013, Chita. [Google Scholar]
  12. State Standard 13109-97. Electrical Energy. Electromagnetic compatibility of technical equipment. Power quality limits in public electrical systems. (IPK. Publishing House of Standards. M.: 2005) [Google Scholar]
  13. State Standard 32144-2013. Electric Energy. Electromagnetic compatibility of technical equipment. Power quality limits in public power supply systems (M.: Standartinform, 2014) [Google Scholar]
  14. Agreement No. 18.7500.2896.13 for electricity transmission services, of July 22, 2013, Chita [Google Scholar]
  15. A.L. Tserazov, N.I. Yakimenko, Information materials No. 70. Research on the influence of voltage imbalance and non-sinusoidality on the operation of asynchronous motors (State Energy Publishing House. Moscow. Leningrad. 1963) [Google Scholar]
  16. M.A. Silaev, V.N. Tulskiy, R.G. Shamonov, Influence of system operation on voltage non-sinusoidality and imbalance in the main electrical networks, Energy of Russia in the 21st century. Innovative development and control: Collected papers of the All-Russian Conference “Energy of Russia in the 21st century. Innovative Development and Control” (Irkutsk, Russia, September 1-3, 2015). Irkutsk, 189-194 (2015) [Google Scholar]
  17. Protocol No. 2347/128 of electrical energy tests for compliance with the requirements of State Standard 32144-2013 at the 220/110/35/10/6 kV Mogocha substation (110 kV outdoor switchgear, 110-73 Verkhnyaya Davenda-Mogocha overhead line) (2015) [Google Scholar]
  18. Protocol No. 2479/114 of tests of electrical energy for compliance with the requirements of State Standard 32144-2013 at the 110/35/6 kV “Verkhnyaya Davenda” substation (outdoor switchgear-35 kV, 35-238 “Verkhnyaya Davenda-Kudecha” overhead line) (2015) [Google Scholar]
  19. Protocol No. 2349/97 of tests of electrical energy for compliance with the requirements of State Standard 32144-2013 at the 110/35/6 kV “Verkhnyaya Davenda” substation (indoor switchgear-6 kV, cell no. 12, feeder no. 4 “Aleksandrovsky Mine” (2015) [Google Scholar]
  20. Protocol No. 2347-170411 of electrical energy tests for compliance with the requirements of State Standard 32144-2013 at the 35/6 kV Fabrika substation (indoor switchgear-6 kV, cell no. 11) (2017) [Google Scholar]
  21. Protocol No. 2349-170411 of electrical energy tests for compliance with the requirements of State Standard 32144-2013 at the 35/6 kV Fabrika substation (indoor switchgear-6 kV, cell no. 12) (2017) [Google Scholar]
  22. Protocol No. 2337-170411 electrical energy tests for compliance with the requirements of State Standard 32144-2013 at the 110/35/6 kV “Verkhnyaya Davenda” substation (Outdoor switchgear-110 kV, 110-73-“Davenda-Mogocha” overhead line) (2017) [Google Scholar]
  23. Protocol No. 2484-170411 of electrical energy tests for compliance with the requirements of State Standard 32144-2013 at the 110/35/6 kV “Verkhnyaya Davenda” substation (outdoor switchgear-110 kV, 110-72 “Ksenyevskaya-Davenda” overhead line) (2017) [Google Scholar]
  24. Contract No. 20.7500.763.12 for the technological connection of July 10, 2012, Chita [Google Scholar]
  25. Letter of the General Director of the JSC “Chitaenergosbyt” to the Office of the Federal Antimonopoly Service for the Trans-Baikal Territory dated 23.11.2015. Chita [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.