Open Access
Issue
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
Article Number 05002
Number of page(s) 5
Section Urban Environmental Architecture and Digital Design Application
DOI https://doi.org/10.1051/e3sconf/202123605002
Published online 09 February 2021
  1. Ni Hong. Application practice of BIM technology in the construction of housing construction projects[J]. Building materials and decoration, 2020(21):1+3. [Google Scholar]
  2. Du Wenhui. Research on the application of BIM technology in construction project management[J]. Value Engineering, 2019, 38(34): 280-281. [Google Scholar]
  3. Pang Donghui. Research on the application of BIM technology in construction project management[J]. Urban Architecture, 2019, 16(33): 113-114. [Google Scholar]
  4. Zhang Shoubiao. Application analysis of BIM technology in construction progress forecasting and management of construction projects[J]. Housing and Real Estate, 2019(31): 123. [Google Scholar]
  5. Lin Cong. The application of BIM technology in building construction[J]. Doors and Windows, 2019(20): 51. [Google Scholar]
  6. Qin Feng. The application of BIM technology in the teaching of construction project management[J]. Building Materials and Decoration, 2018(43):141-142. [Google Scholar]
  7. Li Zhipeng. The application of BIM technology in the teaching of construction project management in secondary vocational schools[J]. Contemporary Teaching Research Collection, 2018(04):132-133. [Google Scholar]
  8. Zhu Shuo. The application of BIM technology in the teaching of construction project management secondary vocational schools [J]. Talent, 2017(15):142. [Google Scholar]
  9. Shi Xiaoqing, Yang Gongquan, Wang Xiaoyong. Analysis of the application of BIM technology in construction project management [J]. Anhui Architecture, 2016, 23(06):180-181+187. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.