Open Access
Issue
E3S Web Conf.
Volume 238, 2021
100RES 2020 – Applied Energy Symposium (ICAE), 100% RENEWABLE: Strategies, Technologies and Challenges for a Fossil Free Future
Article Number 02008
Number of page(s) 7
Section Hybrid Systems
DOI https://doi.org/10.1051/e3sconf/202123802008
Published online 16 February 2021
  1. IRENA, Global Renewables Outlook: Energy Transformation 2050. (2020). [Google Scholar]
  2. A. Hirsch, Y. Parag, and J. Guerrero, “Microgrids: A review of technologies, key drivers, and outstanding issues, ” Renew. Sustain. Energy Rev., 90, March, (2018). [Google Scholar]
  3. P. Blechinger, R. Seguin, C. Cader, P. Bertheau, and C. Breyer, “Assessment of the global potential for renewable energy storage systems on small islands, ” Energy Procedia, 46, (2014). [Google Scholar]
  4. A. Corsini and E. Tortora, “Sea-water desalination for load levelling of gen-sets in small off-grid islands, ” Energies, 11, 8, (2018). [Google Scholar]
  5. European Commission, “Clean energy for EU islands, ” (2017). [Online]. Available: https://ec.europa.eu/energy/topics/renewableenergy/initiatives-and-events/clean-energy-euislands_en. [Accessed: 25-Mar-2020]. [Google Scholar]
  6. J. K. Kaldellis and D. Zafirakis, “Prospects and challenges for clean energy in European Islands.The TILOS paradigm, ” Renew. Energy, 145, (2020). [Google Scholar]
  7. ENEA and ANCIM, Le Isole Minori Tra Sole, Mare e Vento. (2019). [Google Scholar]
  8. Legambiente, “Isole sostenibili. Osservatorio sulle isole minori. Le sfide per le isole minori italiane e le buone pratiche nel mondo, ” (2019). [Google Scholar]
  9. MISE, Decree for “Disposizioni per la progressiva copertura del fabbisogno delle isole minori non interconnesse attraverso energia da fonti rinnovabili.” (2017). [Google Scholar]
  10. Segreteria Generale Presidenza Regione Siciliana, “Le isole minori della Sicilia. Report, analisi, e valutazione dei flussi turistici, ” (2015). [Google Scholar]
  11. D. Fioriti, R. Giglioli, D. Poli, G. Lutzemberger, A. Micangeli, R. Del, I. Perezarriaga, and P. Duenas-martinez, “Stochastic sizing of isolated rural mini-grids, including effects of fuel procurement and operational strategies, ” Electr. Power Syst. Res., 160, (2018). [Google Scholar]
  12. D. Fioriti and D. Poli, “A novel stochastic method to dispatch microgrids using Monte Carlo scenarios, ” Electr. Power Syst. Res., 175, December 2018, (2019). [Google Scholar]
  13. A. Micangeli, R. Del Citto, I. Kiva, S. Santori, V. Gambino, J. Kiplagat, D. Viganò, D. Fioriti, and D. Poli, “Energy Production Analysis and Optimization of Mini-Grid in Remote Areas: The Case Study of Habaswein, Kenya, ” Energies, 10, 12, (2017). [Google Scholar]
  14. A. A. Setiawan, Y. Zhao, and C. V. Nayar, “Design, economic analysis and environmental considerations of mini-grid hybrid power system with reverse osmosis desalination plant for remote areas, ” Renew. Energy, 34, 2, (2009). [Google Scholar]
  15. D. Airoldi, D. Bertani, E. Garofalo, S. Guastella, E. Lembo, C. Sandroni, and F. Giudici, “Scenari di sviluppo delle FER nelle isole minori italiane non interconnesse e analisi di casi studio, ” RSE, (2017). [Google Scholar]
  16. F. Giudici, A. Castelletti, E. Garofalo, M. Giuliani, and H. R. Maier, “Dynamic, multiobjective optimal design and operation of water-energy systems for small, off-grid islands, ” Appl. Energy, 250, May, (2019). [PubMed] [Google Scholar]
  17. Comune di Ustica, “Piano di Azione per l’Energia Sostenibile Isola di Ustica, ” (2015). [Google Scholar]
  18. ARERA, Delibrerazione 2 Dicembre 2015, 583/2015/R/COM. (2015). [Google Scholar]
  19. ARERA, “Documento per la consultazione 115/2018/R/EFR, ” (2018). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.