Open Access
Issue
E3S Web Conf.
Volume 242, 2021
The 7th International Conference on Renewable Energy Technologies (ICRET 2021)
Article Number 03001
Number of page(s) 7
Section Electronics and Electrical Engineering
DOI https://doi.org/10.1051/e3sconf/202124203001
Published online 10 March 2021
  1. Harvey Lehpamer, Introduction to Power Utility Communication, Artech House Publishers, ISBN13:978-1-63081-006-1 (2016) [Google Scholar]
  2. Sarawak Digital Economy Strategy 2018-2022, Accessed on: March 13, 2020. [Online]. Available: https://www.scope.net.my/wp-content/uploads/2019/10/digitaleconomybookletmin.pdf [Google Scholar]
  3. H. R Singh & S. Gupta, Broadband Communication over Power Lines: Issues, Challenges and Opportunities, International Journal of Advanced Research in Computer Science. ISSN No. 09765697. Volume 7, No. 7 (Nov-Dec 2016) [Google Scholar]
  4. F. Hashiesh & P. Soukal, A Proposed Broad Power Line Communication System for Smart Grid Application in a Typical Egyptian Network, 17th Telecommunication forum TELFPR 2009, Serbia, Belgrade (November 24-26, 2009) [Google Scholar]
  5. Businesswire, Russia Fixed Broadband Market Statistics and Analyses Report 2019, August 19, 2019. Accessed on: March 13, 2020. [Online]. Available: https://www.businesswire.com/news/home/20190819005409/en/Russia-Fixed-Broadband-MarketStatistics-Analyses-Report (2019) [Google Scholar]
  6. Markets and Markets, Power Line Communication Market by Offering (Hardware, Software, and Services), Frequency (Narrowband, and Broadband), Application (Energy Management and Smart Grid, and Indoor Networking), Vertical, and Geography Global Forecast to 2023, December 2017. Accessed on: March 4, 2020. [Online]. Available: https://www.marketsandmarkets.com/Market-Reports/power-line-communication-plc-market912.html (2017) [Google Scholar]
  7. MyBroadband, Ghanaian broadband powerline test, July 2005, Accessed on: March 7, 2020. [Online]. Available: https://mybroadband.co.za/nephp/500.html (2005) [Google Scholar]
  8. P. Adepoju, Ghana’s public electricity company to deploy fiber, October 8, 2019, Accessed on: March 7, 2020. [Online]. Available: https://itweb.africa/content/O2rQGMAnrYlqd1ea (2019) [Google Scholar]
  9. Sujatha k, S. et al., BROAD BAND OVER POWERLINE: Provides Internet Facility To Remote Areas, International Journal of Pure and Applied Mathematics, Volume 117 No. 22 2017, 185-188, ISSN: 1314-3395 (2017) [Google Scholar]
  10. A. Olandres, Telstra teams up with Meralco for Gigabit Internet-over-Powerline, April 1, 2016, Accessed on: March 8, 2020. [Online]. Available: https://www.yugatech.com/rumors/telstra-teams-up-with-meralco-for-gigabit-internet-overpowerline/#sthash.9YVqJuna.dpbs (2016) [Google Scholar]
  11. L. T. Berger et al., MIMO Power Line Communications: Narrow and Broadband Standards, EMC, and advanced processing, CRC Press, Inc ISBN 978-1-4665-5752-9 [Google Scholar]
  12. A. M. Sarafi, G. I. Tsiropoulos and P. G. Cottis, “Hybrid wireless-broadband over power lines: A promising broadband solution in rural areas”, in IEEE Communications Magazine, vol. 47, no. 11, pp. 140-147 (November 2009) [Google Scholar]
  13. Industry Canada Spectrum Management and Telecommunication. Consulataion Paper on Broad over Power Line (BPL) Communication Systems. SMSE-005-5 July 2005. (2005) [Google Scholar]
  14. Malaysian Communications and Multimedia Commission (MCMC), Network Performance Report 2019, Measurig Malaysia Broadband and voice performance. [Online]. Available: https://www.mcmc.gov.my/skmmgovmy/media/General/pdf/QoSNetwork-Performance-Report2019.pdf (2019) [Google Scholar]
  15. International Telecommunication Union, The State of Broadband: Broadband as a Foundation for Sustainable Development, September 2019 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.