Open Access
Issue |
E3S Web Conf.
Volume 251, 2021
2021 International Conference on Tourism, Economy and Environmental Sustainability (TEES 2021)
|
|
---|---|---|
Article Number | 01013 | |
Number of page(s) | 10 | |
Section | Analysis of Energy Industry Economy and Consumption Structure Model | |
DOI | https://doi.org/10.1051/e3sconf/202125101013 | |
Published online | 15 April 2021 |
- A. Viana, J. P. de Sousa, Using metaheuristics in multi objective resource constrained project scheduling, European Journal of Operational Research 120 (2) (2000). [Google Scholar]
- Cheng, M. Y., Prayogo, D., & Tran, D. H., Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search. Journal of Computing in Civil Engineering, (2015) [Google Scholar]
- Doulabi, S. H. H., Seifi, A., & Shariat, S. Y., Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), (2010) [Google Scholar]
- Duan, S., & Zhang, J., Multi-Project Resource Leveling Allocation Research Based on Improved Genetic Algorithm. Journal of Industrial Technological Economics, 36(10), (2017) (in Chinese) [Google Scholar]
- El-Abbasy, M. S., Elazouni, A., & Zayed, T., Generic Scheduling Optimization Model for Multiple Construction Projects. Journal of Computing in Civil Engineering, 31(4), (2017) [Google Scholar]
- Geng, J. Q., Weng, L. P., & Liu, S. H., An improved ant colony optimization algorithm for nonlinear resource-leveling problems. Computers & Mathematics with Applications, 61(8), (2011) [Google Scholar]
- J. Weglarz, On certain models of resource allocation problems, Kybernetics 9 61–66. (1981) [Google Scholar]
- Joy, J., Rajeev, S., & Narayanan, V., Particle Swarm Optimization for Resource Constrained-project Scheduling Problem with Varying Resource Levels. Procedia Technology, 25, (2016) [Google Scholar]
- K. Neumann, J. Zimmermann, Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints, European Journal of Operational Research 17 (2) (2000) [Google Scholar]
- Li, H., Zhe, X., & Demeulemeester, E., Scheduling Policies for the Stochastic Resource Leveling Problem. Journal of Construction Engineering & Management, 141(2), (2015) [Google Scholar]
- Liu, J., & Lu, M. (2019). Robust Dual-Level Optimization Framework for Resource-Constrained Multiproject Scheduling for a Prefabrication Facility in Construction. Journal of Computing in Civil Engineering, 33(2), (2019) [Google Scholar]
- Menesi, W., & Hegazy, T., Multimode Resource- Constrained Scheduling and Leveling for Practical- Size Projects. Journal of Management in Engineering, (2014) [Google Scholar]
- Mohammad Ranjbar, Mohammad Khalilzadeh, Fereydoon Kianfar, Kobra Etminani. An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resourceconstrained project scheduling problem [J]. Computers & amp; Industrial Engineering, 62(1)2011. [Google Scholar]
- Nima Zoraghi, Aria Shahsavar, Babak Abbasi, Vincent Van Peteghm. Muti-mode resourceconstrained project scheduling problem with material ordering under bonus-penalty policies. [J]. TOP, 25(1). 2017 [Google Scholar]
- Piryonesi, S. M., Nasseri, M., & Ramezani, A., Resource Leveling in Construction Projects with Activity Splitting and Resource Constraints: A Simulated Annealing Optimization. Canadian Journal of Civil Engineering, (2018) [Google Scholar]
- Ponz-Tienda, J. L., Yepes, V., Pellicer, E., & Moreno-Flores, J. m The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm. Automation in Construction, 29 (Complete), 161–172 (2013). [Google Scholar]
- Ponz-Tienda, J. L., Salcedo-Bernal, A., Pellicer, E., & Benlloch-Marco, J., Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags. Automation in Construction, 77, 82–92 (2017). DOI: 10.1016/j.autcon.2017.01.018. [Google Scholar]
- R. Slowinski, Muti-objective network scheduling with efficient use of renewable and nonrenewable resources, European Journal of Operational Research 7 265–273 (1981). [Google Scholar]
- Selvam, G., & Tadepalli, T. C. M., Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, (1), 1–10 (2019). [Google Scholar]
- S. Shadrokh, F. Kianfar, A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty, European Journal of Operational Research 181 (1) 86–101. (2007) [Google Scholar]
- Wang, H. X., Wang, Z. H., & Zhu, M., Differential evolution algorithm for multi-project resource leveling problem. Journal of Interdisciplinary Mathematics, 20(6-7), 1383–1386. (2017) [Google Scholar]
- Zhong, Y., Chen, Z., & Zhou, Z., Resource Allocation Model and Strategy Research of Large-scale Construction Project: System Dynamics Modeling and Simulation. Chinese Journal of Management Science, 24(3), 125–132. (2016) (in Chinese) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.