Open Access
Issue |
E3S Web Conf.
Volume 251, 2021
2021 International Conference on Tourism, Economy and Environmental Sustainability (TEES 2021)
|
|
---|---|---|
Article Number | 03086 | |
Number of page(s) | 5 | |
Section | Research on Earth Climate and Land and Ocean Resources | |
DOI | https://doi.org/10.1051/e3sconf/202125103086 | |
Published online | 15 April 2021 |
- L. Wang, M. Torngren, and M. Onori, “Current status and advancement of cyber-physical systems in manufacturing” J. Manuf. Syst, vol. 37, pp. 517–527, Oct. 2015. [Google Scholar]
- K. Ding, P. Jiang, and S. Su, “RFID-enabled social manufacturing system for inter-enterprise monitoring and dispatching of integrated production and transportation tasks” Robot. Comput.-Integr. Manuf., vol. 49, pp. 120–133, Feb. 2018. [Google Scholar]
- W. Ji and L. H. Wang, “Big data analytics based fault prediction for shop floor scheduling” J. Manuf. Syst., vol. 43, pp. 187–194, Apr. 2017. [Google Scholar]
- J. Wang, Y. Ma, L. Zhang, R. X. Gao, and D. Wu, “Deep learning for smart manufacturing: Methods and applications”. Manuf. Syst., vol. 48, pp. 144–156, Jul. 2018. [Google Scholar]
- F. Tao, Q. Qi, A. Liu, and A. Kusiak, “Data-driven smart manufacturing” J. Manuf. Syst., vol. 48, pp. 157–169, Jul. 2018. [Google Scholar]
- X. Xu, “From cloud computing to cloud manufacturing” Robot. Comput.-Integr. Manuf., vol. 28, pp. 75–86, Feb. 2012. [Google Scholar]
- L. Ren, L. Zhang, L. Wang, F. Tao, and X.D. Chai, “Cloud manufacturing: Key characteristics and applications” Int. J. Comput. Integr. Manuf., vol. 30, no. 6, pp. 501–515, 2017. [Google Scholar]
- A. Weber, “Smart Manufacturing Stakeholders and Their Requirements” 2018 e-Manufacturing & Design Collaboration Symposium (eMDC), Hsinchu, 2018, pp. 1–3. [Google Scholar]
- B. H. Zhou and Z.Y. Zhong, “Lagrangian relaxation algorithm for reentrant hybrid flow shop scheduling” Control Theory and Applications, 2015, 32(07):881–86. [Google Scholar]
- L. Chen, “Global optimality conditions for linearly constrained polynomial integer programming problems” Journal of Chongqing Normal University, 2017, 34 (01):7–11. [Google Scholar]
- S. H. Li, “Superheuristic genetic algorithm solves fuzzy flexible job shop scheduling” Control Theory and Applications, 2020, 37(02):316–330. [Google Scholar]
- S. H. Liu, “Double Taboo Table Taboo Search Algorithm for Solving Workshop Scheduling Problem” Journal of Harbin Institute of Technology, 2016, 21 (06):50–54. [Google Scholar]
- J. L. Sun and D. P. Jiang, “The construction method of the consistent judgment matrix in the hierarchical analysis method” Journal of Southeast University, 1991(03):69–75. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.