Open Access
Issue
E3S Web Conf.
Volume 253, 2021
2021 International Conference on Environmental and Engineering Management (EEM 2021)
Article Number 02041
Number of page(s) 5
Section Big Data Environment Management Application and Industry Research
DOI https://doi.org/10.1051/e3sconf/202125302041
Published online 06 May 2021
  1. Zhong, R.Y.; Peng, Y.; Xue, F.; Fang, J.; Zou, W.; Luo, H.; Thomas Ng, S.; Lu, W.; Shen, G.Q.P.; Huang, G.Q. Prefabricated construction enabled by the Internet-of-Things. Autom. Constr. 2017, 76, 59–70. [Google Scholar]
  2. Smit, R.E. Off-Site Construction Implementation Resource: Off-Site and Modular Construction Explained. In Off-Site Construction Council; National Institute of Building Sciences: Washington, DC, USA, 2014. [Google Scholar]
  3. The People's Daily, http://www.xinhuanet.com/politics/2020-04/21/c_1125882638.htm [Google Scholar]
  4. Ibrahim Yahaya Wuni & Geoffrey Qiping Shen (2019): Critical success factors for modular integrated construction projects: a review, Building Research & Information, [Google Scholar]
  5. Gibb, A. G. F., & Isack, F. (2003). Re-engineering through pre- assembly: Client expectations and drivers. Building Research and Information, 31(2), 146–160. [Google Scholar]
  6. Akagi, K., Murayama, K., Yoshida, M., & Kawahata, J. (2002). Modularization technology in power plant construction. In Proceedings of ICONE10 10th international conference on Nuclear engineering (pp. 21–27), Arlington, VA. [Google Scholar]
  7. Choi, J. O., & O’Connor, J. T. (2014). Modularization critical success factors accomplishment: Learning from case studies. Construction Research Congress, 1636–1645. [Google Scholar]
  8. Ji, Y., Qi, L., Liu, Y., Liu, X., Li, H. X., & Li, Y. (2018). Assessing and prioritising delay factors of prefa bricated concrete building projects in China. Applied Sciences, 8(11), 2324. [Google Scholar]
  9. Hsu, P. Y., Angeloudis, P., & Aurisicchio, M. (2018). Optimal logistics planning for modular construction using two-stage stochastic programming. Automation in Construction, 94, 47–61. [Google Scholar]
  10. Ahmadian, F.F.A.; Akbarnezhad, A.; Rashidi, T.H.; Waller, S.T. Accounting for Transport Times in Planning Off-Site Shipment of Construction Materials. J. Constr. Manag. Econ. 2016, 142, 04015050. [Google Scholar]
  11. Haas, C. T., & Fagerlund, W.R. (2002). Preliminary research on prefabrication, pre-assembly, modularization and off- site fabrication in construction. Austin, TX. Retrieved from https://smartech.gatech.edu/handle/1853/10883 [Google Scholar]
  12. Rentschler, C., Mulrooney, M., & Shahani, G. (2016). Modularization: The key to success in today’s market. Hydrocarbon Processing, 95(12), 27–30. [Google Scholar]
  13. Li, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., & Shen, G. Q. (2017). Integrating RFID and BIM technol- ogies for mitigating risks and improving schedule perform- ance of prefabricated house construction. Journal ofCleaner Production, 165, 1048–1062. [Google Scholar]
  14. Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018a). Key constraints and mitigation strategies for prefabricated prefinished volu- metric construction. Journal of Cleaner Production, 183, 183–193. [Google Scholar]
  15. Pan, W., & Hon, C. K. (2018). Modular integrated construc- tion for high-rise buildings. Proceedings of the Institution of Civil Engineers - Municipal Engineer, 1–12. [Google Scholar]
  16. Tam, V. W. Y., Tam, C. M., & Ng, W. C. Y. (2007). On prefab- rication implementation for different project types and pro- curement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), 68–80. [Google Scholar]
  17. Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007). Perspective of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), 183–194. [Google Scholar]
  18. Monty Sutrisna, Jack Goulding, (2019) “Managing information flow and design processes to reduce design risks in offsite construction projects”, Engineering, Construction and Architectural Management, https://doi.org/10.1108/ECAM-11-2017-0250 [Google Scholar]
  19. People's daily :About 40000 builders built huoshenshan and leishenshan hospital in 10 days 2020-04-21 http://www.xinhuanet.com/politics/2020-04/21/c_1125882638.htm [Google Scholar]
  20. Huoshenshan hospital -- this is “Chinese speed”. Li Pengxiang, Li Jinfeng, Liang Jianqiang HSE (2015), “Managing health and safety in construction: construction (Design and Management) Regulations 2015: guidance on regulations”, Health and Safety Executive, London [Google Scholar]
  21. Gündüz, M., Nielsen, Y., & Özdemir, M. (2013). Qu antification of delay factors using the relative import ance index method for construction projects in Turke y. J. Manag. Eng., 29(2), 133–139. [CrossRef] [Google Scholar]
  22. X. Li, M. AlHussein, Z. Lei, Z. Ajweh, Risk identific ation and assessment of modular construction utilizin g fuzzy analytic hierarchy process (AHP) and simu- l ation, Can. J. Civ. Eng. 40 (12) (2013) 1184–1195 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.