Open Access
Issue
E3S Web Conf.
Volume 257, 2021
5th International Workshop on Advances in Energy Science and Environment Engineering (AESEE 2021)
Article Number 02063
Number of page(s) 4
Section Research on Energy Consumption and Energy Industry Benefit
DOI https://doi.org/10.1051/e3sconf/202125702063
Published online 12 May 2021
  1. Li Ming, Tan Jieren, Kuang Shifang. Research on the whole process evaluation of power grid project investment based on variable weights[J]. Electric Power Survey and Design, 2020(12): 79-84. [Google Scholar]
  2. Ma Qian, Wang Zhaocong, Pan Xueping, Liu Xiaofan. Evaluation method of power grid investment decision based on utility function under the environment of new power reform[J]. Electric Power Automation Equipment, 2019, 39(12): 198-204. [Google Scholar]
  3. Liu Yinghan. Application of economic benefit evaluation mechanism for power grid projects in investment decision-making[J]. China Management Information Technology, 2020, 23(17): 28-29. [Google Scholar]
  4. Dong Xiaojun, Niu Sai. Process and method of post-evaluation of county-level distribution network projects[J]. Rural Power Management, 2019(10): 59-60. [Google Scholar]
  5. Wang Zheng. Research on Evaluation of Investment Benefit and Investment Decision of Power Grid Project Based on Super-efficient DEA [D]. Research on Evaluation of Investment Benefit and Investment Decision of Power Grid Project Based on Super-efficient DEA [D] North China Electric Power University (Beijing), 2018. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.