Open Access
Issue |
E3S Web Conf.
Volume 264, 2021
International Scientific Conference “Construction Mechanics, Hydraulics and Water Resources Engineering” (CONMECHYDRO - 2021)
|
|
---|---|---|
Article Number | 02011 | |
Number of page(s) | 9 | |
Section | Road Construction, Building Structures and Materials | |
DOI | https://doi.org/10.1051/e3sconf/202126402011 | |
Published online | 02 June 2021 |
- Decree of the President of the Republic of Uzbekistan dated February 7, N° UP-4947 Strategy of action in five priority areas of the development of the Republic of Uzbekistan in 2017-2021 (2017) [Google Scholar]
- Lanis A.L. Reinforcement of the main site of a high embankment with the injection of hardening solutions Bulletin of the Siberian State University of Railway Engineering 3 (50) pp. 38–46, (2019 [Google Scholar]
- Lanis A.L. 2018 The results of modeling exploited embankments during pressure injection of hardening solutions Bulletin of the Siberian State University of Railway Engineering 3 (46), pp. 43–50, (2018) [Google Scholar]
- Lesov K.S., Tadjibaev Sh.A. and Kenjaliyev M.K., Technology for strengthening slopes of the subgrade of railroads made of sandy soils using geosynthetic materials Problems of architecture and construction 4, pp. 15–18, (2019) [Google Scholar]
- Lesov K.S., Kenzhaliev M.K. and Tadzhibaev Sh.A., Determination of the stability of the embankment of the subgrade of railways built from fine sands International Scientific and Technical Conference “Global Partnership - As a Condition and Guarantee of Sustainable Development” 2 pp. 248–252 [Google Scholar]
- Lanis A.L., Methods of strengthening the subgrade by injection Proceedings of the Trans-Siberian Railway 3 (27), pp. 117–124, (2016) [Google Scholar]
- Zakirov R.S. and Omarov A.D., Anti-deformation reinforcement of a subgrade made of sandy soil in Kazakhstan (Almaty: Gylym) p. 164. (1999) [Google Scholar]
- Lesov K.S., Mirakhmedov M.M. and Tadjibaev Sh.A., 2019 World experience in the use of geosynthetic materials in subgrade designs Architecture, Construction. Design. Scientific and practical journal 2 pp. 194–197. [Google Scholar]
- ODM 218.5.005-2010 Classification, terms, definitions of geosynthetic materials in relation to the road sector [Google Scholar]
- ISO 10318: 2005 Geosynthetics - Terms and definitions (Geosynthetic materials. Terms and definitions) [Google Scholar]
- SP 32.104-98. Set of rules design of the subgrade of 1520 mm gauge railways (Moscow, Gosstroy of the Russian Federation) p. 22, (1999) [Google Scholar]
- The code of rules of the joint venture 78.13330.2012. Roads, Updated version of SNiP 3.06.03-85. [Google Scholar]
- Shakhunyants G.M. Railway track: textbook for high schools (Moscow, Transport) p. 479. (1987) [Google Scholar]
- The project of JSC “BOSHTRANSLOYIHA” Removal of the existing railway section of Dunguluk-Burgutli-Misken from the flood zone of the Shurbulak reservoir, (2019) [Google Scholar]
- ODM 218.5.003-2010, Recommendations for the use of geosynthetics in the construction and repair of roads p. 71, (2010) [Google Scholar]
- Guidance on the use of polymeric materials to strengthen the subgrade when repairing the track (Ministry of Railways of Russia, Moscow IKC “Akademkniga”) p. 110, (2002) [Google Scholar]
- Lesov K.S. The technology of reinforcing the embankment of the subgrade of railroads from sandy soils using geosynthetic materials Bulletin of TashIIIT 2 pp. 1116, (2019) [Google Scholar]
- KMK 3.02.01-97 Earthworks, foundations and foundations [Google Scholar]
- ShNK 3.01.01-03 Organization of construction production [Google Scholar]
- ODM 218.2.046-2014, Recommendations on the selection and quality control of geosynthetic materials used in road construction p. 1472, (2014) [Google Scholar]
- KMK 3.01.02-00 2000 Safety measures in construction (State Architectstroi of the Republic of Uzbekistan) p. 38 [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.