Open Access
Issue
E3S Web Conf.
Volume 274, 2021
2nd International Scientific Conference on Socio-Technical Construction and Civil Engineering (STCCE – 2021)
Article Number 09016
Number of page(s) 10
Section Innovative and Smart Technologies in Architectural and Construction Education
DOI https://doi.org/10.1051/e3sconf/202127409016
Published online 18 June 2021
  1. O. A. Pobegailov, A. V. Shemchuk, Mo deling of technological processes in the organization of construction productio, Online Journal of Science, 4, 4 (2012) URL: https://cyberleninka.ru/article/n/modelirovanie-tehnologicheskih-protsessov-pri-organizatsii-stroitelnogo-proizvodstva (last accessed: 25.04.2021 r.) [Google Scholar]
  2. I.L. Abramov, Modeling of technological processes in low-rise construction. Abstract. (Moscow, 23, 2007) [Google Scholar]
  3. V. V. Sokolnikov Decomposition of the problem of ensuring organizational and technological reliability of construction on the basis of classification of definitions of the conceptual field «organization of construction», Bulletin of Civil Engineers, 3(74), 87–93 (2019) [Google Scholar]
  4. V. V. Sokolnikov, Improvement of operational planning of construction and installation works and their resource support on the basis of a unified information management environment (Autoref. dis. … Candidate of Technical Sciences, St. Petersburg, 2017) [Google Scholar]
  5. V. V. Sokolnikov, Modeling of work organization based on the concept of physical construction flow, Bulletin of Civil Engineers, 1 (72), 87–93 (2019) [Google Scholar]
  6. V. V. Sokolnikov, Modeling of organizational and technological reliability of construction, Bulletin of Civil Engineers, 4 (69), 92–97 (2018) [Google Scholar]
  7. V. V. Kostyuchenko, D. O. Kudinov, Organizational and technical modeling of design and construction systems, Engineering Bulletin of the Don, 3 (2012) http://www.ivdon.ru/magazine/archive/n3y2012/988 (last accessed: 25.04.2021 r.) [Google Scholar]
  8. A. R. Borodin, S. A. Barkalov, A. Sychev, Modeling of optimal priority of implementation of innovative projects, Bulletin of the Moscow Automobile and Road State Technical University (MADI), 4, 77–81 (2008) [Google Scholar]
  9. S. A. Bolotin, A. Kh. Dadar, K.V. Ivanov, D.T. Kurasova, Model of risk planning for untimely performance of work in POS on the basis of spatiotemporal analogy, Bulletin of Civil Engineers, 6(41), 69–75 (2013) [Google Scholar]
  10. S. A. Bolotin, A. Kh. Dadar, I.S. Ptukhina, Improving the PERT method in statistical modeling of calendar plans, Bulletin of Civil Engineers, 2, 132–138 (2012) [Google Scholar]
  11. S. A. Bolotin, A. Kh. Dadar, M.A. Kotovskaya, Model of spatial-temporal analogy in the optimization of the sequence of reconstructed objects, Civil Engineering Journal, 7, 51–57 (2013) [Google Scholar]
  12. I. Yu. Meshchaninov, Improvement of the search model for optimal priority of object development, in Proccedings of the 66th Scientific Conference of professors, teachers, researchers, engineers and postgraduates of SPbGASU, Saint Petersburg, 2009 [Google Scholar]
  13. V. V. Sobolev, Matematicheskoe modelirovanie i metody optimizatsii v proektirovanii organizatsii stroitelstva [Mathematical modeling and optimization methods in the design of construction organizations], The North Caucasus region. Series: Technical Sciences, 1 (159), 106–109 (2011) [Google Scholar]
  14. V.V. Sobolev, Mathematical modeling and optimization of the sequence of construction of objects according to the criterion of time, Izvestiya vysshikh uchebnykh zavedeniy. The North Caucasus region. Series: Technical Sciences, 3 (161), 30–32 (2011) [Google Scholar]
  15. V. Ya. Mishchenko, N.A. Ponyavina., A.N. Nazarov, Modeling of a stable organizational and technological system of reproduction of urban infrastructure, Scientific Bulletin of the Voronezh State University of Architecture and Civil Engineering. Series: High-tech. Ecology, 1, 74–80 (2010) [Google Scholar]
  16. S. A. Bolotin, Simulation of calendar planning in building information modeling programs and regression detailing of construction duration norms, Engineering and construction magazine, 7 (25), 82–86 (2011) [Google Scholar]
  17. N.A. Goryaeva, A.O. Rybakova, Cloud technologies of interaction in design and construction, BST: Bulletin of construction equipment, 4 (1004), 28–31 (2018) [Google Scholar]
  18. S. A. Krivoy, A.I. Semin, A.V. Popov, B.O. Tebekin, The relationship of bim scenarios within the investment and development project, Construction of unique buildings and structures, 2 (65), 20–39 (2018) [Google Scholar]
  19. I.V. Karakozova, A.S. Pavlov, Creating a network model based on a universal sequence of construction works, Construction: science and education, 10 (3), 1–16 (2020) [Google Scholar]
  20. V. V. Sobolev, V. R. N. Gerasimenko, Z. K. Himishev, Information modeling of interrelations between the parameters of the work front, News of higher educational institutions. The North Caucasus region. Series: Technical Sciences, S1, 16–19 (2008) [Google Scholar]
  21. V. V. Sobolev, Information modeling in the development of construction organization projects and work production projects, News of higher educational institutions. The North Caucasus region. Series: Technical Sciences, S1, 31–35 (2008) [Google Scholar]
  22. I. G. Shepelev, Mathematical methods and models in construction («VSH», Moscow, 213, 1980) [Google Scholar]
  23. B. Ya. Soviets, S.A. Yakovlev, Modeling of systems («VSH», Moscow, 270, 1985) [Google Scholar]
  24. A. Webster, G. Sege, Differential equations in partial derivatives of mathematical physics, Ch. 1. (ONTI, Moscow, Leningrad, 285, 1934) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.