Open Access
Issue |
E3S Web Conf.
Volume 275, 2021
2021 International Conference on Economic Innovation and Low-carbon Development (EILCD 2021)
|
|
---|---|---|
Article Number | 03027 | |
Number of page(s) | 5 | |
Section | Environmental Protection and Governance Innovation Technology Research | |
DOI | https://doi.org/10.1051/e3sconf/202127503027 | |
Published online | 21 June 2021 |
- Wang M. Research and Analysis of Contractor Construction Cost Management Based on BIM Technology Platform[J]. 2019, 003(001):P.1-6. [Google Scholar]
- Zhang L, Dong Z, Zhang L, et al. Cost Management of Mechanical and Electrical Engineering Project Based on Bim Technology[J]. 2018, 002(004):P.95-99. [Google Scholar]
- Zhang S, Pan F, Shi Y, et al. Collaborative schedule-cost management of hydropower projects based on BIM and P3E/C[J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2018, 37(10):103-112. [Google Scholar]
- Zhou H, Liu K, Zhou D, et al. Project construction process optimization management based on BIM modelling technology[J]. IPPTA: Quarterly Journal of Indian Pulp and Paper Technical Association, 2018, 30(7):360-370. [Google Scholar]
- Marzouk M, Enaba M. Analyzing project data in BIM with descriptive analytics to improve project performance[J]. Built environment project and asset management, 2019, 9(4):476-488. [CrossRef] [Google Scholar]
- Naml E, Ikda M, Kocakaya M N. Building Information Management (BIM), A New Approach to Project Management[J]. Journal of Sustainable Construction Materials and Technologies, 2019, 4(1):323-332. [CrossRef] [Google Scholar]
- Meisaroh M, Husin A E, Susetyo B. Analysis of Key Success Factors Using RII Method on The Implementation Building Information Modeling (BIM)-Based Quantity Take-Off to Improve Cost Performance Hospital Structure[J]. Solid State Technology, 2021, 64(2):3179-3188. [Google Scholar]
- Yismalet A, Patel D. A CRITICAL LITERATURE REVIEW ON IMPROVING PROJECT COST MANAGEMENT PRACTICE AND PROFITABILITY OF DOMESTIC CONTRACTORS[J]. International Journal of Engineering Technologies and Management Research, 2020, 5(1):51-58. [CrossRef] [Google Scholar]
- Toosi H, Chamikarpour A. A New Cost Management System for Construction Projects to increase Competitiveness and Traceability in a Project Environment[J]. Revista de Contabilidad, 2021, 24(1):31-47. [CrossRef] [Google Scholar]
- Yan M. Resource-based Optimization Model for Dynamic Project Planning and Cost Management[J]. Applied Mathematics & Information Sciences, 2017, 11(4):1091-1096. [CrossRef] [Google Scholar]
- Hu Jinlan, B Wang, J Dong. Analysis on Cost Management Status Quo and Development Trend of Distribution Network Project[J]. 2019, 006(002): 106-111. [Google Scholar]
- Discussion on Project Cost Management and Budget Compilation in China[J]. Management Science and Engineering, 2021, 10(1):32-39. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.