Open Access
Issue |
E3S Web Conf.
Volume 275, 2021
2021 International Conference on Economic Innovation and Low-carbon Development (EILCD 2021)
|
|
---|---|---|
Article Number | 03083 | |
Number of page(s) | 4 | |
Section | Environmental Protection and Governance Innovation Technology Research | |
DOI | https://doi.org/10.1051/e3sconf/202127503083 | |
Published online | 21 June 2021 |
- Li Naixu. Study on Supply Chain Risk Early Warning of Industrial Construction Project [D]. Xi ’an University of Architecture and Technology, 2020. [Google Scholar]
- Jiang Xin, Sun Zhengxi, Xu Ping, Wu Yuanli, Li Hongming. Hydropower project group of the supply chain risk assessment research [J]. The people of the Yangtze river, 2016, 47 (6): 78-81+91. DOI: 10.16232/j.carolcarrollnki.1001-4179.2016.06.017 [Google Scholar]
- Xu Yongge, Chen Xinran, Li Ran. Research on risk management of engineering project supply chain [J]. Hydropower, 2018, 44(08): 87-90+100. [Google Scholar]
- Wang Guotao, He Lina. Supply Chain Risk Management Based on Hesitation Fuzzy Dematel and Risk House [J/OL]. Computer Integrated Manufacturing Systems: 1-18 [2020-08-20 16:41]. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.