Open Access
Issue
E3S Web Conf.
Volume 276, 2021
2021 5th International Conference on Water Conservancy, Hydropower and Building Engineering (WCHBE 2021)
Article Number 02005
Number of page(s) 8
Section Research on Building Structure and Construction Technology
DOI https://doi.org/10.1051/e3sconf/202127602005
Published online 23 June 2021
  1. Liu Ling. Modern Construction Management methods and Application[M]. Wuhan: Wuhan Industry Press, 2019 [Google Scholar]
  2. Wang Bingjie, Zhang Lei; Study on the Risk Analysis Method of Project Investment[C]. 4th International Institute of Statistics and Management Engineering Symposium (IISMES), Shandong Appl Stat Assoc, Dalian, PEOPLES R CHINA, 2011:329–333. [Google Scholar]
  3. Xu X., Yang Z., Jin L., et al. Research on Risk Assessment of Port Project Investment and Construction[J]. Journal of Coastal Research, 2020, 115(sp1):187. [Google Scholar]
  4. Momeni M.A., Yaghoubi S., Aliha M. An optimal control model for analyzing quality investment in the project management[J]. Computers & Industrial Engineering, 2019, 129(MAR.):529–544. [Google Scholar]
  5. Carvallo J.P., Murphy S.P., Stuart E., et al. Evaluating project level investment trends for the U.S. ESCO industry: 1990-2017[J]. Energy Policy, 2019, 130:139–161. [Google Scholar]
  6. Deng Fumin; Jin Yanan; Ye Meng, et al. New Fixed Assets Investment Project Environmental Performance and Influencing Factors-An Empirical Analysis in China's Optics Valley [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 24(16). [Google Scholar]
  7. Tang W., Cui Q., Zhang F., et al. Urban Rail-Transit Project Investment Benefits Based on Compound Real Options and Trapezoid Fuzzy Numbers [J]. Journal of Construction Engineering and Management, 2019, 145(1): 05018016. 1-05018016.11. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.