Open Access
Issue
E3S Web Conf.
Volume 283, 2021
2021 3rd International Conference on Civil, Architecture and Urban Engineering (ICCAUE 2021)
Article Number 02012
Number of page(s) 8
Section Urban Planning and Protection of Natural Environment Facilities
DOI https://doi.org/10.1051/e3sconf/202128302012
Published online 07 July 2021
  1. Wang, Liu Yong, Yuan Jiao, et al. Development and application of intelligent monitoring and evaluation system for settlement of high-speed railway. Journal of railway engineering, 2019, 36 (4). PP. 20–25. [Google Scholar]
  2. Khairallah D., Blanc J., Hornych P., et al. Influence of the Bituminous Layer on Temperature and Water Infiltration in Railway Structures of the Bretagne-Pays de la Loire High-Speed Line. Journal of testing and evaluation, 2020, 48(1). pp. 134–149. [Google Scholar]
  3. Park S., Kim J., Kim J., et al. Analysis of Dynamic Characteristics of Deformed Concrete Slab Track on Transition Zone in High-Speed Train Line According to Train Speeds. Applied Sciences, 2020, 10(20). pp. 71–74. [Google Scholar]
  4. Songxuguo, Guoshuaijie, Chen Hongyun. Calculation of settlement of parallel high speed railway based on stress extraction of numerical model. Railway standard design, 2019, 63 (3). PP. 5–11. [Google Scholar]
  5. Li Longkun, Guoxuping Tianchunyang, et al. on the application of High-speed Railway Settlement Monitoring in the project of Zhengxu high-speed railway crossing under 107 auxiliary roads. Resource guide, 2019, 1 (4). PP. 32–34 [Google Scholar]
  6. Moghadam M. Numerical Analysis of Railways on Soft Soil Under Various Train Speeds. Transportation Infrastructure Geotechnology, 2020, 45(4). pp. 179–191. [Google Scholar]
  7. Mehrabi, N., Khabbaz, H. A trustful transition zone for high-speed rail using the stone column technique. Australian Journal of Civil Engineering, 2020, 6(2). pp. 59–67. [Google Scholar]
  8. Yaoyang Ping, Wang Wei, Wang Naidong, et al. Prediction method of long-term settlement of high-speed railway subgrade under the influence of temporary line loading. Journal of geotechnical engineering, 2019, 41 (4). PP. 625–630 [Google Scholar]
  9. Li Xuegui. Analysis of settlement observation of the off-line project of the station building of Yinxi high speed railway airport. Encyclopedia forum electronic, 2019, 1 (6). Pp.287. [Google Scholar]
  10. Muhammed J., Jayawickrama P., Teferra A., et al. Settlement of a railway embankment on PVD-improved Karakore soft alluvial soil, 2020, 2(4). pp. 233–251. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.