Open Access
Issue
E3S Web Conf.
Volume 296, 2021
1st International Conference on Environmental Sustainability Management and Green Technologies (ESMGT 2021)
Article Number 02007
Number of page(s) 8
Section Resource Conservation and Sustainable Consumption and Production Patterns
DOI https://doi.org/10.1051/e3sconf/202129602007
Published online 28 July 2021
  1. Russian Railways https://company.rzd.ru/ [Google Scholar]
  2. JSC “Codex”, http://docs.cntd.ru/ [Google Scholar]
  3. Trading house “BMZ” Moscow, https://www.bmzm.ru/ [Google Scholar]
  4. S. Suvorova, E. Naumova, I. Scherbanyuk, I., IOP Conference Series: Materials Science and Engineering, 918(1), 012044 (2020) [Google Scholar]
  5. A. Egorov, N. Pilipchuk, I. Khmelev, V. Shatokhin, A. Kovkin, IOP Conference Series: Materials Science and Engineering, 698(6), 066050 (2019) [Google Scholar]
  6. S. Aksentijevic, E. Tijan, M. Jovic, N. Munitic, 43rd International Convention on Information, Communication and Electronic Technology, 20179309, 9 (2020) [Google Scholar]
  7. Kh.T. Turanov, A.A. Gordienko, Technologies of placement and securing cargoes in cars (Ural State University of Railway transport Press, Ekaterinburg, 2020) [Google Scholar]
  8. Kh.T. Turanov, A.A. Gordienko, S.A. Sitnikov, Science and Technology in Transport, 2, 8 (2014) [Google Scholar]
  9. Information portal “LABOR PROTECTION IN RUSSIA”, https://ohranatruda.ru/ [Google Scholar]
  10. ISO, https://www.iso.org/ [Google Scholar]
  11. Kh.T. Turanov, Interaction of open rolling stock and solid cargo (Educational and Methodological Center for Education in Railway Transport, Moscow, 2011) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.