Open Access
Issue
E3S Web Conf.
Volume 300, 2021
2021 2nd International Conference on Energy, Power and Environmental System Engineering (ICEPESE2021)
Article Number 01016
Number of page(s) 9
Section Energy and Power Engineering
DOI https://doi.org/10.1051/e3sconf/202130001016
Published online 06 August 2021
  1. Bo Rui, Luo Yangtao, Li Liang. Study on safeguard measures of Sichuan hydropower consumption[J]. Design of Hydroelectric Power Station, 2019, 35(4):97-102. [Google Scholar]
  2. Liu Weijia, Wen Fushuan, Xue Yusheng, Zhao Junhua, Dong Zhaoyang, Zheng Yu. Cost Characteristics and Economic Analysis of Power-to-gas Technology[J]. Automation of Electric Power Systems, 2016, 40(24):1-11. [Google Scholar]
  3. Su Yongxin, Nie Weiqi, Tan Mao. Day-ahead Interval Optimization of Integrated Energy System Considering Wind Power Integration and Gas-Electricity Transformation[J]. Automation of Electric Power Systems, 2019, 43(17):63-74. [Google Scholar]
  4. Zhang Rufeng, Jiang Tao, Li Guoqing, Chen Houhe, Li Xue, Ning Ruoxi. Bilevel Optimization Dispatch of Integrated Electricity-Natural Gas System Considering P2G for Wind Power Accommodation[J]. Proceedings of the CSEE, 2018, 38(19):56685678, 5924. [Google Scholar]
  5. Cui Yang, Zeng Peng, Zhong Wuzhi, Wang Zheng, Zhang Peng, Zhao Yuting. Low-carbon Economic Dispatch of Electro-gas-thermal Integrated Energy System Based on Oxy-combustion Technology[J]. Proceedings of the CSEE, 2021, 41(2):592-608. [Google Scholar]
  6. Huang Guori, Liu Weijia, Wen Fushuan, Dong Zhaoyang, Zheng Yu, Zhang Rui. Collaborative Planning of Integrated Electricity and Natural Gas Energy Systems with Power-to-Gas Stations[J]. Electric Power Construction, 2016, 37(9): 1-13. [Google Scholar]
  7. Xu Zhiheng. Optimal Dispatching of Integrated Natural gas and Electricity System and Configuration of P2G Facilities[D]. South China University of Technology, 2018. [Google Scholar]
  8. Zhang Li, Yang Jiang, Jian Xuehui, Zhang Feng, Han Xueshan. Unit Commitment with Energy Storage Considering Operation Flexibility at Sub-hourly Time-scales[J]. Automation of Electric Power Systems, 2018, 42(16): 21-31, 56. [Google Scholar]
  9. Xu Zhiheng, Zhang Yongjun, Chen Zexing, Lin Xiaoming, Chen Boda. Bi-level Optimal Capacity Configuration for Power to Gas Facilities Considering Operation Strategy and Investmen Subject Benefit[J]. Automation of Electric Power Systems, 2018, 42(13): 76-84. [Google Scholar]
  10. Tao Xiaolong. The Study on the Calculation Model of Abandon Hydropower[D]. North China Electric Power University, 2014. [Google Scholar]
  11. Yang Zijuan, Gao Ciwei, Zhao Ming. Review of Coupled System Between Power and Natural Gas Network[J]. Automation of Electric Power Systems, 2018, 42(16): 2131, 56. [Google Scholar]
  12. Xu Zhiheng, Zhang Yongjun, Chen Zexing, Lin Xiaoming, Chen Boda. Bi-level Optimal Capacity Configuration for Power to Gas Facilities Considering Operation Strategy and Investment Subject Benefit[J]. Automation of Electric Power Systems, 2018, 42(13): 76-84. [Google Scholar]
  13. Wei Zhinong, Zhang Side, Sun Guoqiang, Zang Haixiang, Chen Sheng, Chen Shuang. Power-to-gas Considered Peak Load Shifting Research for Integrated Electricity and Natural-gas Energy Systems[J]. Proceedings of the CSEE, 2017, 37(16): 4601-4609+4885. [Google Scholar]
  14. Gong Xiaoqin, Wang Jin, Wang Long, Zhang Han, Qian Jiahui, Deng Minghui. Low-carbon economic operation for integrated electricity and natural-gas energy system with power-to-gas[J]. Journal of electric power science and technology, 2020, 35(02): 76-83. [Google Scholar]
  15. Zheng Zhan. Models And Algorithms Research of Optimization Operation for Interdependent Electricity-Natural Gas Network in Integrated Energy System[D]. South China University of Technology, 2018. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.