Open Access
Issue
E3S Web Conf.
Volume 310, 2021
Annual International Scientific Conference “Spatial Data: Science, Research and Technology 2021”
Article Number 06003
Number of page(s) 7
Section General and Special Purpose Cartographic Models. Land and Information Systems. Land Management
DOI https://doi.org/10.1051/e3sconf/202131006003
Published online 15 October 2021
  1. Gulnaz Aksenova, Arto Kiviniemi, Tuba Kocaturk and Albert Lejeune (2019) From Finnish AEC knowledge ecosystem to business ecosystem: lessons learned from the national deployment of BIM, Construction Management and Economics, 37:6, 317335, DOI: 10.1080/01446193.2018.1481985 [Google Scholar]
  2. Becker T., Nagel C., Kolbe T.H. (2011) Integrated 3D Modeling of Multi-utility Networks and Their Interdependencies for Critical Infrastructure Analysis. In: Kolbe T., König G., Nagel C. (eds) Advances in 3D Geo-Information Sciences. Lecture Notes in Geoinformation and Cartography. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-12670-3_1 [Google Scholar]
  3. Maiorov A.A., Materukhin A.V. Analysis of existing technologies used to process streams of spatio-temporal data for modern information measurement systems // Measurement Techniques. 2017. Volume 60, Issue 4, pp. 350–354 DOI: https://doi.org/10.1007/s11018-017-1200-9. [CrossRef] [Google Scholar]
  4. Trisyanti, S. W., Suwardhi, D., Murtiyoso, A., and Grussenmeyer, P. (2019) Low cost web-application for management of 3d digital building and complex based on BIM and GIS, Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XLII-2/W17, 371–375, doi.org/10.5194/isprs-archives-XLII-2-W17-371-2019. [CrossRef] [Google Scholar]
  5. Junxiang Zhu, Xiangyu Wang, Mengcheng Chen, Peng Wu, Mi Jeong Kim. Integration of BIM and GIS: IFC geometry transformation to shapefile using enhanced opensource approach. Publication: Automation in Construction. Publisher: Elsevier. October 2019. https://doi.org/10.1016/j.autcon.2019.102859 [Google Scholar]
  6. Yuju, H., Peng, H., Yanian, W. et al. Mathematical basis for large scale GIS and terrestrial digital products. Geo-spat. Inf. Sci. 4, 35–41 (2001). https://doi.org/10.1007/BF02826922 [CrossRef] [Google Scholar]
  7. Portnov A. M. (2021) Coordinate basis adaptation of cataloging of unified immovable complexes included into the Russian-Chinese initiative project “One Belt – One Way” (by example railway transport). J. Phys.: Conf. Ser. 1715 012054. DOI: 10.1088/1742- 6596/1715/1/012054. [CrossRef] [Google Scholar]
  8. John P. Snyder. Space Oblique Mercator Projection. Mathematical Development. Geological survey bulletin 1518. Library of Congress catalog-card № 81-607029 [Google Scholar]
  9. John W. Hessler. Philip lee Phillip society occasional paper series №.5. Library of Congress. Washington. D.C. 2004 Geography and map division. [Google Scholar]
  10. Engels, J., Grafarend, E. The oblique Mercator projection of the ellipsoid of revolution IE2a, b. Journal of Geodesy 70, 38–50 (1995). https://doi.org/10.1007/BF00863417 [CrossRef] [Google Scholar]
  11. Lee, J., & Zlatanova, S. (2008). A 3D data model and topological analyses for emergency response in urban areas. In S. Zlatanova & J. Li (Eds.), Geospatial information technology for emergency response (ISPRS book series) (pp. 143–168). London: Taylor & Francis Group. [Google Scholar]
  12. Susanna Vass & Tina Karrbom Gustavsson (2017) Challenges when implementing BIM for industry change, Construction Management and Economics, 35:10, 597-610, DOI: 10.1080/01446193.2017.1314519 [CrossRef] [Google Scholar]
  13. Zhiliang Ma, Yuan Ren. Integrated Application of BIM and GIS: An Overview. Procedia Engineering. Volume 196, 2017, Pages 1072-1079 https://doi.org/10.1016/j.proeng.2017.08.064. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.