Open Access
Issue |
E3S Web Conf.
Volume 375, 2023
8th International Conference on Energy Science and Applied Technology (ESAT 2023)
|
|
---|---|---|
Article Number | 02014 | |
Number of page(s) | 6 | |
Section | Clean Energy Technologies | |
DOI | https://doi.org/10.1051/e3sconf/202337502014 | |
Published online | 27 March 2023 |
- Deng Q, Santos BF, Curran R. A practical dynamic programming based methodology for aircraft maintenance check scheduling optimization [J]. European journal of operational research, 2020, 281(2): 256-273. [CrossRef] [Google Scholar]
- Heil J, Hoffmann K, Buscher U. Railway crew scheduling: models, methods, and applications [J]. European Journal of Operational Research, 2020, 283(2): 405-425. [CrossRef] [Google Scholar]
- Tang J, Xu L, Luo C, et al. Multi-disruption resilience assessment of rail transit systems with optimized commuter flows [J]. Reliability Engineering & System Safety, 2021, 214:107715. [CrossRef] [Google Scholar]
- Lunardi WT, Birgin EG, Ronconi DP, et al. Metaheuristics for the online printing shop scheduling problem [J]. European Journal of Operational Research, 2021, 293(2): 419-441. [CrossRef] [Google Scholar]
- Guo K, Zhang L. Multi-objective optimization for improved project management: current status and future directions [J]. Automation in Construction, 2022, 139:104256. [CrossRef] [Google Scholar]
- Cao J, Zhao P, Liu G. Optimizing the production process of modular construction using an assembly line-integrated supermarket [J]. Automation in Construction, 2022, 142:104495. [CrossRef] [Google Scholar]
- Wu K, Garcia De Soto B, Zhang F. Spatio-temporal planning for tower cranes in construction projects with simulated annealing [J]. Automation in construction, 2020, 111:103060. [CrossRef] [Google Scholar]
- Wang, Heng-Wei, Lin, Jia-Rui, Zhang, Jian-Ping. A resource-constrained project scheduling problem considering productivity and process [J]. Journal of Tsinghua University (Natural Science Edition), 2020, 60(03): 271-277. [Google Scholar]
- Wang J, Liu KX, Zhang XQ, et al. Multi-resource equilibrium optimization algorithm for construction projects based on subset simulation[J]. Journal of Hunan University (Natural Science Edition), 2021, 48(07): 168-176. [Google Scholar]
- Feng Jingchun, Li Xueming, Feng Hui, et al. Research on project group duration optimization model under resource constraints[J]. Science and Technology Management Research, 2019, 39(11): 219-225. [Google Scholar]
- Jiang X, Hu YW, Li W, et al. Evaluation and prediction of resource conflict risk in hydropower project clusters from the perspective of construction companies[J]. South-North Water Diversion and Water Resources Science and Technology, 2019, 17(05): 202-208. [Google Scholar]
- Li Q, Liu S.F. A gray target decision model for two-stage equipment maintenance policy selection [J]. Control and Decision, 2022:1-9. [Google Scholar]
- Bhadra D, Dhar NR, Abdus Salam M. Sensitivity analysis of the integrated AHP-TOPSIS and CRITICTOPSIS method for selection of the natural fiber [J]. Materials today : proceedings, 2022, 56: 2618-2629. [CrossRef] [Google Scholar]
- Peng J, Zhang J. Urban flooding risk assessment based on GIS- game theory combination weight: A case study of Zhengzhou City [J]. International journal of disaster risk reduction, 2022, 77:103080. [CrossRef] [Google Scholar]
- Wu Jiahui, Wang Weiqing, Wang Haiyun, et al. Static voltage stability analysis of power grids based on comprehensive weight theory and Fuzzy-TOPSIS integrated evaluation[J]. Power System Protection and Control, 2018, 46(23): 77-85. [Google Scholar]
- Feng Jingchun, Liu Qin, Chen Rundong, et al. Optimizing the allocation of A-supplied non-commodity resources for project clusters based on synthetic event technology[J]. Journal of Systems Management, 2022:1-12. [Google Scholar]
- Zhang JG, Li J, Cheng NO. A two-stage monitoring and warning mechanism for critical chain multi-projects based on integrated priority[J]. Journal of Management Engineering, 2021, 35(06): 226-233. [Google Scholar]
- Zhang JG, Li K. Research on critical chain schedule monitoring method based on project resource segmentation [J]. Management Review, 2021, 33(06): 224-231. [Google Scholar]
- Li Qian, Wei Jie-Lin, Liu Feng-Tao. Construction and application of risk contagion network of engineering project cluster based on complex system[J]. Journal of Railway Science and Engineering, 2022:1-8. [Google Scholar]
- Su C.X., Kil J.X., Zou X., et al. A new 0-1 hybrid linear optimization model for a class of local resource-constrained project scheduling problems [J]. Chinese Management Science, 2022:1-15. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.