Open Access
Issue |
E3S Web of Conf.
Volume 405, 2023
2023 International Conference on Sustainable Technologies in Civil and Environmental Engineering (ICSTCE 2023)
|
|
---|---|---|
Article Number | 03014 | |
Number of page(s) | 13 | |
Section | Structural Engineering & Concrete Technology | |
DOI | https://doi.org/10.1051/e3sconf/202340503014 | |
Published online | 26 July 2023 |
- B. Parampara, Communication Media BPSDM Ministry of PUPR Edition 08. “Safety Construction: Commitment and Consistency in Implementing SMK3”, p. 1-35, 2018. [Google Scholar]
- A.M. Darwis, N. Noviponiharwani, A.W.L. Latief and A. Nirwana, “Kejadian kecelakaan kerja di industri percetakan kota Makassar,” Jurnal Kesehatan Masyarakat Maritim, 3(2), 2020. [CrossRef] [Google Scholar]
- International Labor Organization (ILO), 2017. [Google Scholar]
- International Labor Organization. Improving the Safety and Health of Young Workers. Jakarta: ILO, 2018. [Google Scholar]
- Government Regulation (PP) No. 50 of 2012. Implementation of Occupational Safety and Health Management Systems. [Google Scholar]
- Minister of PUPR Regulation No. 10 of 2021 concerning Construction Safety Management Systems. [Google Scholar]
- Y.S. Pratiwi, “Development of an information system for maintenance work and maintenance of architectural components of green buildings for government buildings using building information modeling (BIM) in the office buildings of the Ministry of public works and public housing,” 2019. [Google Scholar]
- Laws Of The Republic Indonesia. Number 28 Of 2002. Concerning. Building. [Google Scholar]
- S. Alizadehsalehi, I. Yitmen, T. Celik and D. Arditi, “The effectiveness of an integrated BIM/UAV model in managing safety on construction sites,” International Journal of Occupational Safety and Ergonomics (JOSE), 2018, DOI:10.1080/10803548.2018.1504487. [Google Scholar]
- V. Elsye, Y. Latief and L.S. Riantini, “Development of work breakdown structure (WBS) standard for producing the risk-based structural work safety plan of a building,” Paper presented at The Third International Conference on Sustainable Infrastructure and Built Environment (SIBE 2017),Bandung, Indonesia: MATEC Web of Conferences. 2018. [Google Scholar]
- V. Getuli, S.M. Ventura, P. Caponea, “BIM-based code checking for construction health and safety. Procedia Engineering,” 196, 454 – 461, 2017. [Google Scholar]
- PMI, “PMBOK Guide 6 edition,” Pmi, 2017. [Google Scholar]
- J.T. Marchewka, “Information Technology Project Management,” 5th ed. Hoboken: John Wiley, 2015. [Google Scholar]
- M. Rianty, Y. Latief and L.S Riantini, “Development of risk-based standardized WBS (Work Breakdown Structure) for quality planning of high-rise building architectural works,” Paper presented at The 2nd International Joint Conference on Advanced Mechanical and Power Engineering (ISAMPE 2017). Bali, Indonesia: MATEC Web of Conferences, 2017. [Google Scholar]
- I.K. Wicaksono and M. Singgih, “Risk Management of K3 Safety and HealthWork on the Puncak Permai Surabaya Apartment construction project,” Proceedings of the Seminar National Management of Technology XIII, MMT-ITS, Surabaya, 2011. [Google Scholar]
- Y.Y. Sinaga, C. N. Bintang and T. W. Adi, “Identification and analysis of work accident risk with the FMEA (Failure Mode and Effect Analysis) and FTA (Fault Tree Analysis) methods on the Surabaya-Mojokerto toll road project”. Journal of Pomits Engineering, 1 (1), 1-5, 2014. [Google Scholar]
- G. Satrio and Y. Latied, “Development of Risk-Based Standardized WBS (Work Breakdown Structure) For Safety Planning Of Cable Stayed Bridge Project Proceedings Of The International Conference On Industrial Engineering And Operations Management”, 2018-March, 2694-2710 [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.