Open Access
Issue
E3S Web Conf.
Volume 430, 2023
15th International Conference on Materials Processing and Characterization (ICMPC 2023)
Article Number 01245
Number of page(s) 9
DOI https://doi.org/10.1051/e3sconf/202343001245
Published online 06 October 2023
  1. W.I. Paniagua, Construction of Drilled Displacement and Auger Cast In Place Piles, Simp. Inclusiones Rígidas En Suelos Blandos Difíciles. (2005). http://ss1.webkreator.com.mx/4_2/000/000/04c/d58/wpaniagua_displacement piles.pdf. [Google Scholar]
  2. S. Gupta, C.G. Pvt, R. Sundaram, C.G. Pvt, S. Gupta, V. President, C.G. Pvt, Identifying Defects in Deep Bored Piles - Case Studies from India Identifier les défauts dans les pieux forés - É tudes de cas en Inde, (2008) 2767–2770. [Google Scholar]
  3. S. Gupta, Quality Assurance for Deep Bored Piles- a Case Study, (2012) 608–611. [Google Scholar]
  4. Z. hui Wan, G. liang Dai, W. ming Gong, Field study on post-grouting effects of cast-in-place bored piles in extra-thick fine sand layers, Acta Geotech. 14 (2019) 1357–1377. https://doi.org/10.1007/s11440-018-0741-7. [Google Scholar]
  5. W.J.B.S. Fernando, R. Thivakar, State-of-the-Art Technique to Appraise the Quality of Piling, Eng. J. Inst. Eng. Sri Lanka. 40 (2007) 77. https://doi.org/10.4038/engineer.v40i4.7157. [Google Scholar]
  6. N. Thasnanipan, Z.Z. Aye, K. Singtogaw, S. Pravesvararat, Current Practice and Future Trends of Cast-in-Place Deep Foundation in Thailand, 40743 (2004) 128–139. https://doi.org/10.1061/40743(142)8. [CrossRef] [Google Scholar]
  7. L. Nucci, D. Narvaez, T. Krettenauer, Second Edition Second Edition, Dairy Sci. Technol. CRC Taylor Fr. Gr. (2014) 1–542. [Google Scholar]
  8. L. Ding, K. Li, Y. Zhou, P.E.D. Love, An IFC-inspection process model for infrastructure projects: Enabling real-time quality monitoring and control, Autom. Constr. 84 (2017) 96–110. https://doi.org/10.1016/j.autcon.2017.08.029. [CrossRef] [Google Scholar]
  9. W.I. Paniagua, Deep Foundations in Mexico City at the Early XXI Century, (n.d.). [Google Scholar]
  10. Z.Z. Aye, T. Boonyarak, CURRENT PRACTICES OF DEEP FOUNDATIONS AND DEEP EXCAVATION WORKS CURRENT PRACTICES OF DEEP FOUNDATIONS AND DEEP EXCAVATION WORKS IN MYANMAR Zaw Zaw Aye , Thayanan Boonyarak , Aung Win Maung , , Aye Yadana Aung, (2021). https://doi.org/10.13140/RG.2.2.29126.50245. [Google Scholar]
  11. D. a. Brown, S.D. Dapp, W.R. Thompson, C. a. Lazarte, Geotechnical Engineering Design and Construction of Continuous Flight Auger Piles, Security. (2007) 293. [Google Scholar]
  12. R.H. Morin, D.R. LeBlanc, W.E. Teasdale, A Statistical Evaluation of Formation Disturbance Produced by Well-Casing Installation Methods, Groundwater. 26 (1988) 207–217. https://doi.org/10.1111/j.1745-6584.1988.tb00385.x. [CrossRef] [Google Scholar]
  13. J. Henninges, G. Zimmermann, J. Schrötter, K. Erbas, E. Huenges, Wireline Distributed Temperature Measurements and Permanent Installations Behind Casing, Proc. World Geotherm. Congr. (2005) 24–29. [Google Scholar]
  14. M. Ćosić, B. Folić, R. Folić, Numerical simulation of the pile integrity test on defected piles, Acta Geotech. Slov. 11 (2014) 5–19. [Google Scholar]
  15. K.S.G. A.K. Choudhary, J.N.Jha, Copyright ASCE 2010 GeoShanghai 2010 International Conference GEOTECHNICAL SPECIAL PUBLICATION NO . 205 Copyright ASCE 2010 GeoShanghai 2010 International Conference, Asce. (2010) 34–41. [Google Scholar]
  16. S.J. Varma, N. Gopalakrishnan, K. Sathish Kumar, P.E. Sakaria, Structural Integrity Evaluation of Pile Foundations By Pile Integrity Testing, Int. J. Struct. Civ. Engg. Res.Ijscer.Com. 2 (2013) 2319–6009. http://www.ijscer.com/uploadfile/2015/0429/20150429075411213.pdf. [Google Scholar]
  17. F.B.J. (Ed. . Barends, Application of Stress-wave Theory to Piles, in: Proc. Fourth Int. Conf., 1992. [Google Scholar]
  18. H.S. Thilakasiri, Interpretation of Pile Integrity Test (PIT) Results, Annu. Trans. IESL. (2006) 78–84. http://139.162.44.104/bitstream/123456789/1363/1/T0787.pdf. [Google Scholar]
  19. S.R.I. Lankan, G. Society, Geotechnical Engineering Project Day 2020, (2020). [Google Scholar]
  20. H. Fitriani, P. Lewis, Characterizing Fuel Use and Emission Rates of Heavy-Duty Diesel Equipment: A Case Study for Wheel Loader, 2014. [Google Scholar]
  21. E. Purwanto, Geotechnical Aspects of Bored Pile Construction on Clayshale, (n.d.). [Google Scholar]
  22. T. De, J. Souza, P.S. Hemsi, P.C. Aoki, R.M. Valverde, Improvement and Extension of the Pile Integrity Test (PIT) under Existing Structures for Foundation Depth Evaluation. Two case studies in Brazil, Electron. J. Geotech. Eng. 22 (2017) 1003–1013. http://www.ejge.com/2017/Ppr2017.0083ma.pdf. [Google Scholar]
  23. F. Rausche, G. Likins, M. Hussein, Formalized procedure for quality assessment of cast-in-place shafts using sonic pulse echo methods, Transp. Res. Rec. (1994) 30–38. [Google Scholar]
  24. C.N. Baker, E.E. Drumright, F.D. Mensah, G. Parikh, C.D. Ealy, Use of Nondestructive Testing to Evaluate defects in drilled Shafts: Results of FHWA Research, Transp. Res. Rec. 1331. (1991) 28–35. [Google Scholar]
  25. D. Sobala, G. Tkaczyński, Interesting Developments in Testing Methods Applied to Foundation Piles, IOP Conf. Ser. Mater. Sci. Eng. 245 (2017). https://doi.org/10.1088/1757-899X/245/2/022074.York: E-Publishing Inc; 1999, p. 281-304. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.