Open Access
Issue |
E3S Web Conf.
Volume 437, 2023
The 5th International Conference on Green Environmental Engineering and Technology (IConGEET2023)
|
|
---|---|---|
Article Number | 04001 | |
Number of page(s) | 12 | |
Section | Green Manufacturing and Technologies | |
DOI | https://doi.org/10.1051/e3sconf/202343704001 | |
Published online | 16 October 2023 |
- Akuete, E..; Nduka, D.O.; Ogundipe, K.E.. Maintenance Feedback Mechanisms and Limiting Factors of Post-Occupancy Evaluation in Student Residents of Higher Education Institutions in Nigeria. Journal of Construction in Developing Countries. (2022), 27(2). [Google Scholar]
- Ogunbayo, B.F.; Aigbavboa, C.; Thwala, W.D. In A Maintenance Management Framework for Municipal Buildings in Developing Economies; Taylor & Francis, (2023). [Google Scholar]
- Aghimien, D.; Aigbavboa, C. Performance of selected funding schemes used in delivering educational buildings in Nigeria. In Proceedings of the International Conference on Industrial Engineering and Operations Management held in Washington DC, USA, (2018), 108-119. [Google Scholar]
- Ewa, U.E. The Budgetary process and educational development-Emphasis on how to avoid abandoned projects. In Education Tax Fund workshop on financing education in Nigeria, (2005). [Google Scholar]
- Okojie, J.A. Innovative funding in the Nigerian university system. Available on: http://www.unilorin.edu.ng/unilorin/downloads/okojie-innovative%20Funding.ppt#. (accessed on 19 August 2022). [Google Scholar]
- Ogbogu, C. O. Policy Issues in the Administration of Higher Education in Nigeria. World Journal of Education. (2013), 3(1), 32-38. [Google Scholar]
- Ibrahim, M.L..; Ibrahim, Y.M.; Adogbo, K.J. Appraisal of Stakeholder Management Practice in Tertiary Education Trust Fund (Tetfund) Construction Project. Unpublished M. Sc. Thesis) Quantity Surveying, Ahmadu Bello University, Zaria Nigeria, (2014). [Google Scholar]
- Ogunsemi, D. R. Value for Money in Construction Projects: The Quantity Surveyor’s Quest. 71st Inaugural Lecture delivered by Prof. D. R. Ogunsemi at the 2500 Capacity Auditorium, Federal University of Technology, Akure, Ondo State. (2015). [Google Scholar]
- Amusan, L.M.; Dosunmu, D.; Joshua, O. Cost and time performance information of building projects in developing economy. International Journal of Mechanical Engineering and Technology (IJMET), (2017), 8(10), 918-927. [Google Scholar]
- Hatush, Z.; Skitmore, M. Evaluating contractor prequalification data: selection criteria and project success factors. Construction Management and Economics. (1997), 15(2), pp.129-147. [CrossRef] [Google Scholar]
- Albtoush, A.F.; Doh, S.I. A Review on causes of cost overrun in the construction projects. International Journal of New Innovations in Engineering and Technology, (2019), 12(3), pp.15-22. [Google Scholar]
- Ewa, U.E. Root causes of project abandonment in tertiary institutions in Nigeria. International Business Research, (2013), 6(11), p.149. [CrossRef] [Google Scholar]
- Oyedele, L. O. Avoiding performance failure payment deductions in PFI/PPP projects: model of critical success factors. Journal of Performance of Constructed Facilities, (2013), 27(3), 283-294. [CrossRef] [Google Scholar]
- Udu, L.E.; Nkwede, J.O. Tertiary education trust fund interventions and sustainable development in Nigerian Universities: evidence from Ebonyi State University, Abakaliki. Journal of sustainable development, (2014), 7(4), p.191. [CrossRef] [Google Scholar]
- Bamiro, O.A.; Adedeji, O.S. Sustainable financing of higher education in Nigeria. A Conceptual Framework. University of Ibadan.(2010). [Google Scholar]
- Adeniyi, P.O. Repositioning Nigerian universities for national sustainable development. In A paper presented at the 10th Iju Quarterly Public Affairs forum series, Ondo state, Nigeria. (2008). [Google Scholar]
- Tertiary Education Trust Fund 2016. www.tetfund.gov.ng. Accessed 28 December (2022). [Google Scholar]
- Yap, J. B. H..; Chow, I. N.; Shavarebi, K. Criticality of construction industry problems in developing countries: Analyzing Malaysian projects. Journal of Management in Engineering, (2019), 35(5), 04019020. [CrossRef] [Google Scholar]
- Hussin, J.M..; Rahman, I.A.; Memon, A.H. The way forward in sustainable construction: issues and challenges. International Journal of Advances in Applied Sciences. (2013), 2(1), pp.15-24. [CrossRef] [Google Scholar]
- Memon, A.H.; Rahman, I.A.; Abdullah, M.R.; Azis, A.A.A. Factors affecting construction cost performance in project management projects: Case of MARA large projects. International Journal of Civil Engineering and Built Environment, (2014), 1(1), pp.30-35. [Google Scholar]
- Osawaru, F.; Amusan, L.; Awotinde, O.; Akanya, C.; Asiyanbola, O.; Akinbo, F. Planning materials supply for construction works. InIOP Conference Series: Earth and Environmental Science. (2018), 173(1), IOP Publishing. [Google Scholar]
- Beste, T.; Klakegg, O.J. Strategic change towards cost-efficient public construction projects. International Journal of Project Management. (2022), 40(4), pp.372-384. [CrossRef] [Google Scholar]
- Akinola, G.; Ogunde, A.; Ogundipe, K.E.; Akuete, E. Factors Influencing Construction Project Planning and Implementation: Lessons from South-Western Nigeria. International Journal of Mechanical Engineering and Technology (IJMET). (2019), 10(4), pp.1-12. [Google Scholar]
- Oyewobi, L.O.; Jimoh, L.O.; Suleiman, B.; Sheu, M.T. Cost Reduction Strategies for Building Construction Projects in Minna. Journal of Research Information in Civil Engineering. (2018), 15, (1). [Google Scholar]
- Oni, O.Z.; Amusan, L.M.; Owolabi, J.D.; Akinbile, B.F. Factors affecting quality management practices on building construction sites in Nigeria. In Journal of Physics: Conference Series. (2019), 1299(1), 012009. IOP Publishing. [CrossRef] [Google Scholar]
- Bhangale, P. P.; Mahajan, A. K. Cost Reduction through Cost Effective Construction Techniques. International Journal of Science and Research. (2015), 4(2) 2167-2169. [Google Scholar]
- Aboelmagd, Y. Assessments of Barriers to Implementing Cost Control and Optimal Cost Reduction Techniques in Construction Projects: A Case Study of Egypt. JES. Journal of Engineering Sciences. (2021), 49(4), pp.509-529. [CrossRef] [Google Scholar]
- Al-Werikat, G. Supply chain management in construction revealed. Int. J. Sci. Technol. Res. (2017), 6(03), pp.106-110. [Google Scholar]
- Kim, Y.W.; Alseadi, I. Identification and evaluation of the influencing factors in target value design process through an industry survey. Journal of Civil Engineering and Construction. (2021), 10(2), pp.75-83. [CrossRef] [Google Scholar]
- Emuze, F.; Mathinya, L. Assessing the feasibility and use of target value design in South African construction. In Annual Conference of the International Group for Lean Construction. (2016), 24, pp. 73-82. [Google Scholar]
- Beemsterboer, S.; Baumann, H.; Wallbaum, H. Ways to get work done: a review and systematisation of simplification practices in the LCA literature. The International Journal of Life Cycle Assessment. (2020), 25, pp.2154-2168. [CrossRef] [Google Scholar]
- Laovisutthichai, V.; Lu, W. Architectural design for manufacturing and assembly for sustainability. Design and Technological Applications in Sustainable Architecture: The perspective of China, Japan, Singapore and Thailand. (2021), 219-233. [CrossRef] [Google Scholar]
- Guerra, B. C.; Leite, F. Circular economy in the construction industry: An overview of United States stakeholders’ awareness, major challenges, and enablers. Resources, conservation and recycling. (2021), 170, 105617. [CrossRef] [Google Scholar]
- Guerra, B. C.; Shahi, S.;, Mollaei, A.; Skaf, N.; Weber, O.; Leite, F.; Haas, C. Circular economy applications in the construction industry: A global scan of trends and opportunities. Journal of cleaner production. (2021), 324, 129125. [CrossRef] [Google Scholar]
- Norouzi, M.; Chàfer, M..; Cabeza, L. F.; Jiménez, L.; Boer, D. Circular economy in the building and construction sector: A scientific evolution analysis. Journal of Building Engineering. (2021), 44, 102704. [CrossRef] [Google Scholar]
- Vivan, A.L.; Ortiz, F.A.H.; Paliari, J.C. Model for kaizen project development for the construction industry. Gestão & Produção. (2016), 23, pp.333-349. [CrossRef] [Google Scholar]
- Miranda, P.; Silva, R.; da Silva, A. F.; Ferreira, C. Kaizen Costing: Systematic Literature Review (2015-2020). Economic and Social Development: Book of Proceedings. (2020), 71-85. [Google Scholar]
- Al-Hajj, A.; Al Zaher, T.H. Effectiveness of implementing Activity Based Costing technique on cost control function and performance of construction projects. In 7th International Conference on Innovation in Architecture, Engineering & Construction, São Paulo, (2012), 15-17 [Google Scholar]
- Tran, U. T., Tran, H. T. Factors of application of activity-based costing method: Evidence from a transitional country. Asia Pacific Management Review. (2022), 27(4), 303-311. [CrossRef] [Google Scholar]
- Delgado, J. M. D.; Oyedele, L.; Ajayi, A.; Akanbi, L.; Akinade, O.; Bilal, M.; Owolabi, H. Robotics and automated systems in construction: Understanding industry-specific challenges for adoption. Journal of Building Engineering. (2019), 26, 100868. [CrossRef] [Google Scholar]
- Kim, S. Y.; Nguyen, V. T. Supply chain management in construction: critical study of barriers to implementation. International Journal of Construction Management. (2022), 22(16), 3148-3157. [CrossRef] [Google Scholar]
- Lin, X.; Mazlan, A. N.; Ismail, S.; Hu, L.; Kasiman, E. H. B.; Yahya, K.. Status of value management studies in construction projects: A systematic review. Ain Shams Engineering Journal. (2023), 14(1), 101820. [CrossRef] [Google Scholar]
- Mangquku, N. N.; Babatunde, O. Awareness of value management among construction professionals working on correctional services (Doctoral dissertation). (2020). [Google Scholar]
- Melo, R. S. S. D.; Kaushik, A.; Koskela, L.; Granja, A. D.; Keraminiyage, K.; Tzortzopoulos, P. Target costing in construction: A comparative study. Iglc. (2014). [Google Scholar]
- Al-Hajj, A.; Rizkallah, K. Earned value in the UAE construction industry: Awareness efficiency and areas of improvement. In Conference: CIB W078. (2012). [Google Scholar]
- Hasan, R.; Chowdhury, S. A.; Akter, J. Construction project monitoring: The cost and schedule control by Earned Value Method (EVM). Journal of Technology Management and Business. (2021), 8(1), 1-9. [CrossRef] [Google Scholar]
- Ogundipe, K.E.; Olaniran, H.F.; Ajao, A.M.; Ogunbayo, B.F. Assessing the Impact of Quality Supervision on Construction Operatives ‘Project Delivery in Nigeria. International Journal of Civil Engineering and Technology. (2018), 9(9), pp.426-439. [Google Scholar]
- Akhil, R. P.; Das, B. B. Cost reduction techniques on MEP projects. In Sustainable Construction and Building Materials: Select Proceedings of ICSCBM, (2018), pp. 495-517. Springer Singapore. [Google Scholar]
- Jain, M. Economic Aspects of Construction Waste Materials in terms of cost savings– A case of Indian construction Industry. International Journal of Scientific and Research Publications. (2012), 2(10), 1-7. [Google Scholar]
- Hong, J.; Shen, G. Q.; Li, Z.; Zhang, B.; Zhang, W. Barriers to promoting prefabricated construction in China: A cost–benefit analysis. Journal of cleaner production. (2018), 172, 649-660. [CrossRef] [Google Scholar]
- Odusami, K. T. Perceptions of construction professionals concerning important skills of effective project leaders. Journal of Management in Engineering. (2002), 18(2), 6167. [CrossRef] [Google Scholar]
- Arantes, A.; Ferreira, L. M. D.; Costa, A. A. Is the construction industry aware of supply chain management? The Portuguese contractors’ perspective. Supply Chain Management: An International Journal. (2015), 20(4), 404-414. [CrossRef] [Google Scholar]
- Hossain, M. U.; Ng, S. T.; Antwi-Afari, P.; Amor, B. Circular economy and the construction industry: Existing trends, challenges and prospective framework for sustainable construction. Renewable and Sustainable Energy Reviews. (2020), 130, 109948. [CrossRef] [Google Scholar]
- Lekan, A.; Aigbavboa, C.; Emetere, M. Managing quality control systems in intelligence production and manufacturing in contemporary time. International Journal of Construction Management. (2023), 23(8):1436-46. [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.