Open Access
Issue
E3S Web Conf.
Volume 476, 2024
The 4th Aceh International Symposium on Civil Engineering (AISCE 2023)
Article Number 01001
Number of page(s) 12
DOI https://doi.org/10.1051/e3sconf/202447601001
Published online 17 January 2024
  1. G. Wu, C. Liu, X. Zhao, and J. Zuo, “Investigating the relationship between communication-conflict interaction and project success among construction project teams,” Int. J. Proj. Manag., vol. 35, no. 8, pp. 1466–1482, 2017, DOI: 10.1016/j.ijproman.2017.08.006. [CrossRef] [Google Scholar]
  2. W. I. Ervianto, Manajemen Proyek Konstruksi (Edisi Revisi). Yogyakarta: Penerbit Andi, 2005. [Google Scholar]
  3. H. Taleb, S. Ismail, M. H. Wahab, W. N. Mardiah, W. M. Rani, and R. C. Amat, “An Overview of Project Communication Management in Construction Industry Projects,” J. Manag. Econ. Ind. Organ., pp. 1–9, 2017, DOI: 10.31039/jomeino.2017.1.1.1. [Google Scholar]
  4. D. William, T. Tirtoatmodjo, and Andi, “Komunikasi Antara Owner Dengan Kontraktor Serta Permasalahanya Pada Proyek Konstruksi Di Surabaya,” J. Dimens. Pratama Tek. Sipil, vol. 9, no. 2, pp. 70–77, 2020. [Google Scholar]
  5. PMI, A Guide to the Project Manajement Body of Knowledge PMBOK® GUIDE Seventh Edition. Newtown Square, Pennsylvania: Project Management Institute, Inc., 2021. [Google Scholar]
  6. S. Malik, M. Taqi, J. M. Martins, M. N. Mata, J. M. Pereira, and A. Abreu, “Exploring the relationship between communication and success of construction projects: The mediating role of conflict,” Sustain., vol. 13, no. 8, 2021, DOI: 10.3390/su13084513. [Google Scholar]
  7. B. Sukindrawati, R. Ade, and T. Qusnan, “Pengaruh Manajemen Pemangku Kepentingan Terhadap Kepercayaan dalam Proyek Konstruksi,” in Seminar Nasional Hasil Riset (SNHR) 2022 Universitas Janabadra Yogyakarta, 2022, pp. 241–248. [Google Scholar]
  8. T. Ferdian, M. Isya, and H. A. Rani, “Analisis Hubungan Dan Pengaruh Faktor-Faktor Berkontribusi Terhadap Kinerja Mutu Proyek Konstruksi Jalan Di Provinsi Aceh,” J. Arsip Rekayasa Sipil dan Perenc., vol. 1, no. 4, pp. 174–183, 2018, DOI: 10.24815/jarsp.v1i4.12468. [CrossRef] [Google Scholar]
  9. J. B. H. Yap, H. Abdul-Rahman, and C. Wang, “Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach,” J. Constr. Eng. Manag., vol. 144, no. 5, p. 04018025, 2018, DOI: 10.1061/(asce)co.1943-7862.0001456. [CrossRef] [Google Scholar]
  10. O. A. Ejohwomu, O. S. Oshodi, and K. C. Lam, “Nigeria’s construction industry: Barriers to effective communication,” Eng. Constr. Archit. Manag., vol. 24, no. 4, pp. 652–667, 2017, DOI: 10.1108/ECAM-01-2016-0003. [CrossRef] [Google Scholar]
  11. P. Andrade Rodriguez, “Conceptual Model of Communication Theories within Project Process,” INNOVA Res. J., vol. 2, no. 3, pp. 42–51, 2017, DOI: 10.33890/innova.v2.n3.2017.131. [CrossRef] [Google Scholar]
  12. M. M. A. Ali and N. Chileshe, “The Influence of Project Manager on The Success of Construction Project,” 2015. [Google Scholar]
  13. B. I. Obonadhuze, C. E. Eze, L. U. Siunoje, and O. Sofolahan, “Causes and Effects of Ineffective Communication on Construction Projects,” Borneo J. Sci. Technol., vol. 3, no. 1, pp. 77–92, 2021, DOI: 10.35370/bjost.2021.3.1-11. [Google Scholar]
  14. H. Shakeri and M. Khalilzadeh, “Analysis of factors affecting project communications with a hybrid DEMATEL-ISM approach (A case study in Iran),” Heliyon, vol. 6, no. 8, p. e04430, 2020, DOI: 10.1016/j.heliyon.2020.e04430. [Google Scholar]
  15. PMI, Construction Extension to the PMBOK® Guide. Pennyslvania: Project Management Institute, Inc., 2016. [Google Scholar]
  16. H. Rani, Manajemen Proyek Konstruksi. Yogyakarta: Deepublish, 2016. [Google Scholar]
  17. D. R. Ibdayanti, C. Z. Oktaviani, and S. Husin, “Kepentingan Relatif Faktor-Faktor Integrasi Manajemen Komunikasi Pada Proyek Konstruksi di Banda Aceh,” vol. 6, no. 1, pp. 39–48, 2023. [Google Scholar]
  18. Sugiyono, Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta, 2013. [Google Scholar]
  19. Suyono, Analisis Regresi untuk Penelitian. Yogyakarta: Deepublish, 2015. [Google Scholar]
  20. G. Mardiatmoko, “Pentingnya Uji Asumsi Klasik Pada Analisis Regresi Linier Berganda,” BAREKENG J. Ilmu Mat. dan Terap., vol. 14, no. 3, pp. 333–342, 2020, DOI: 10.30598/barekengvol14iss3pp333-342. [CrossRef] [Google Scholar]
  21. Y. Y. E. Nugroho, “Analisis Faktor-Faktor yang Mempengaruhi Tingkat Suku Bunga Deposito Berjangka pada Bank Umum di Indonesia Tahun 2006-2008,” Universitas Diponegoro, 2010. [Google Scholar]
  22. R. Mareno, C. Z. Oktaviani, and S. Husin, “Analisis Korelasi Faktor Komunikasi Proyek Terhadap Pencapaian Kinerja Waktu di Kota Banda Aceh,” J. Arsip Rekayasa Sipil dan Perenc., vol. 5, no. 1, pp. 225–233, 2022, DOI: 10.24815/jarsp.v5i1.25284. [Google Scholar]
  23. M. Y. Mehari, “Impact of poor communication on project performance among diverse teams,” Norwegian University of Science and Technology, 2022. [Google Scholar]
  24. N. Y. Katerega and K. A. Masaba, “Project Communication a Dimension for Improved Project Performance: The Case of Selected Public University Projects,” IISTE, vol. 30, pp. 77–84, 2017, [Online]. Available: www.iiste.org. [Google Scholar]
  25. B. Zulch, “The Impact of A Construction Project Manager’s Communication Skills on The Success of A Project,” 2016. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.