Open Access
Issue
E3S Web Conf.
Volume 476, 2024
The 4th Aceh International Symposium on Civil Engineering (AISCE 2023)
Article Number 01002
Number of page(s) 11
DOI https://doi.org/10.1051/e3sconf/202447601002
Published online 17 January 2024
  1. A. Z. Arifin and F. Harianto, “Pengaruh Penerapan Keselamatan Dan Kesehatan Kerja (K3) Serta Lingkungan Kerja Terhadap Produktivitas Kerja Di Surabaya,” Rekayasa J. Tek. Sipil, vol. 5, no. 1, p. 19, 2020, DOI: 10.53712/rjrs.v5i1.856. [CrossRef] [Google Scholar]
  2. M. Komarudin and R. E. Nugroho, “Analysis of the Project Success Factor Through Time, Cost, Labour, Health Safety Environment and Quality Aspects at PT XYZ,” Int. J. Prod. Manag. Eng., vol. 10, no. 1, pp. 33–49, 2022, DOI: 10.4995/ijpme.2022.16021. [CrossRef] [Google Scholar]
  3. M. I. Shamim, “Exploring the Success Factors of Project Management,” Am. J. Econ. Bus. Manag., vol. 5, no. 7, pp. 64–72, 2022, [Online]. Available: https://www.grnjournals.us/index.php/AJEBM [Google Scholar]
  4. S. E. Purbaya, “Identifikasi Faktor Penentu Keberhasilan Proyek Konstruksi Gedung Bertingkat pada Masa Pandemi,” Trijurnal, 2021. [Google Scholar]
  5. M. A. Eid, “The Influence of Human Resources Management Practices on Project Success. Case Study: Higher Private Educational Institutions in Mogadishu - Somalia,” EPRA Int. J. Res. Dev., vol. 37, no. 1, pp. 20–21, 2019, DOI: 10.1108/eb039583. [Google Scholar]
  6. S. Herat and S. C. Chong, “Komponen Kunci dan Faktor Keberhasilan Penting untuk Keberhasilan Manajemen Proyek: Tinjauan Literatur,” No. 4, pp. 431–443, 2021. [Google Scholar]
  7. M. E. Kamau, G. Jane, and K. John, “Influence of Human Related Factors on Success of Construction Project in Kenya,” Int. J. Bus. Manag., vol. 6, no. 5, pp. 251–283, 2018. [Google Scholar]
  8. P. V. Ingle and G. Mahesh, “Construction Project Performance Areas for Indian Construction Projects,” Int. J. Constr. Manag., vol. 22, no. 8, pp. 1443–1454, 2022, DOI: 10.1080/15623599.2020.1721177. [Google Scholar]
  9. C. Kurniawan, O. R. Tandean, H. P. Chandra, and S. Ratnawidjaja, “Indikator dalam Upaya Mempertbaiki Produktivitas Pekerja Konstruksi,” J. Dimens. Pratama Tek. Sipil, vol. 9, no. 2, pp. 62–69, 2020. [Google Scholar]
  10. G. A. P. C. Dharmayanti, I. B. R. Adnyana, and M. A. Nugraha, “Pengaruh Kinerja Sumber Daya Manusia Terhadap Kinerja Proyek Konstruksi di Kabupaten Badung,” J. Ilm. Tek. Sipil, vol. 24, No. 1, 2020. [Google Scholar]
  11. F. Aa, M. Mahmoud, H. Haleema, and R. Almamlook, “Overview Success Criteria and Critical Success Factors in Project Management,” Ind. Eng. Manag., no. April, 2018, DOI: 10.4172/2169-0316.1000244. [Google Scholar]
  12. Sugiyono, Metode Penelitian Kuantitatif, Kualitatif dan R&D. Bandung: Alfabeta, 2016. [Google Scholar]
  13. B. Sukindrawati and R. A. T. Qusnan, “Pengaruh Manajemen Pemangku Kepentingan Terhadap Kepercayaan dalam Proyek Konstruksi,” Semin. Nas. Has. Ris., pp. 241–248, 2022. [Google Scholar]
  14. P. M. I. Pmbok, Construction Extension to the PMBOK® Guide. Project Management Institute, Inc., 2016. [Google Scholar]
  15. Setiawati, “Analisis Pengaruh Kebijakan Deviden Terhadap Nilai Perusahaan Pada Perusahaan Farmasi di BEI,” J. Inov. Penelit., vol. 1, no. 8, pp. 1581–1590, 2021. [Google Scholar]
  16. G. Mardiatmoko, “Pentingnya Uji Asumsi Klasik Pada Analisis Regresi Linier Berganda,” BAREKENG J. Ilmu Mat. dan Terap., vol. 14, no. 3, pp. 333–342, 2020, DOI: 10.30598/barekengvol14iss3pp333-342. [CrossRef] [Google Scholar]
  17. I. Ghozali, Aplikasi Analisis Multivariate dengan Program IBM SPSS 25, 9th ed. Semarang: Badan Penerbit Universitas Diponegoro, 2018. [Google Scholar]
  18. D. Christine, J. Wijaya, K. Chandra, M. Pratiwi, M. S. Lubis, and I. A. Nasution, “Pengaruh Profitabilitas, Leverage, Total Arus Kas dan Ukuran Perusahaan terhadap Financial Distress pada Perusahaan Property dan Real Estate yang Terdapat di Bursa Efek Indonesia Tahun 2014-2017,” Jesya (Jurnal Ekon. Ekon. Syariah), vol. 2, no. 2, pp. 340–350, 2019, DOI: 10.36778/jesya.v2i2.102. [CrossRef] [Google Scholar]
  19. F. Q. A’yuna, “Pengaruh Sumber Daya Manusia Terhadap Kinerja Perusahaan Jasa Pelaksana Konstruksi di Kota Malang,” Universitas Negeri Malang, 2019. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.