Volume 476, 2024
The 4th Aceh International Symposium on Civil Engineering (AISCE 2023)
|
|
---|---|---|
Article Number | 01055 | |
Number of page(s) | 10 | |
DOI | https://doi.org/10.1051/e3sconf/202447601055 | |
Published online | 17 January 2024 |
- I. A. Motowa, C. J. Anumba, S. Lee, F. Pena-Mora, An Integrated system for change management in construction, Journal of Automation in Construction, 368–377 (2007) http://dx.doi.org/10.1016/j.autcon.2006.07.005 [CrossRef] [Google Scholar]
- Mubarak, Nurisra, Kajian Risiko Pekerjaan Tambah-Kurang (Change Order) pada Proyek Konstruksi, Jurnal Teknik Sipil, 8 (1), 11–18 (2009) [Google Scholar]
- L. O. Oyewobi, R. Jimoh, B. O. Ganiyu, A.A. Shittu, Analysis of Causes and Impact of Variation Order on Educational Building Projects, Journal of Facilities Management (2016) [Google Scholar]
- A. Senouci, A. Alsarraj, M. Gunduz, N. Eldin, Analysis of Change Orders in Qatari Construction Projects, International Journal of Construction Management, 17 (4), 280–292 (2017) [CrossRef] [Google Scholar]
- J.O. Uttam, A.N. Bhirud, Review analysis on causes and effects of change orders on construction project, International Journal on Recent and Innovation Trends in Computing and Communication, 3 (4), pp. 2230–2233 (2015) [Google Scholar]
- Y. A. Martanti, Analisis faktor penyebab contract change order dan pengaruhnya terhadap kinerja kontraktor pada proyek konstruksi pemerintah, Jurnal Rekayasa Sipil, 7 (1), 32–42 (2018) [Google Scholar]
- S. Hansen, S.F. Rostiyanti, A. Rif’at, Causes, Effects, and Mitigations Framework of Contract Change Orders: Lessons Learned from GBK Aquatic Stadium Project, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1) (2020) [CrossRef] [Google Scholar]
- A. A. Ardine, H. Sulistio, Penyebab Change Order pada Proyek Konstruksi Gedung Bertingkat. Jurnal Mitra Teknik Sipil, 3 (3), 511 (2020) [CrossRef] [Google Scholar]
- Y. Iskandar, B. Susetyo, A. Suroso, Pengaruh Contract Change Order (CCO) terhadap Kinerja Biaya pada Proyek Hunian Bertingkat Tinggi. Konstruksia, 13 (2), 55–80 (2022) [CrossRef] [Google Scholar]
- M. B. Melissa, J. R. Robert, A.M. Scott Matthews, Life-Cycle Assessment Modeling of Construction Processes for Buildings, ASCE J. Infrastruct. Syst., 16:199–205, 16(3) (2010) https://doi.org/10.1061/(ASCE)IS.1943-555X.0000022 [CrossRef] [Google Scholar]
- S. H. K. Al Sulaimani, H. Yahia, Evaluating the impact of change orders on construction projects in Oman, Journal of Student Research, 10(3), (2021) https://doi.org/10.47611/jsr.v10i3.1296 [Google Scholar]
- H. Kezner, Project Management, A Systems Approach to Planning, Scheduling, and Controlling, 10th edition, John Wiley & Sons, Inc, New York (2009) [Google Scholar]
- D. S. Barrie, B. C. Poulson, Proffesional Construction Manajement. Third Edition. McGraw-Hill. Singapore (1992) [Google Scholar]
- Peraturan Presiden Nomor 16 Tahun 2018 Tentang Pengadaan Barang dan Jasa Pemerintah [Google Scholar]
- S. Hanna, R. Camlic, P. A. Peterson, E. V. Nordheim, Quantitative Definition of projects Impacted by Change Orders, J. of Construction Engineering and Management, 128 (1), p. 57 (2002) [CrossRef] [Google Scholar]
- S. D. Nurlaela, Analisis Faktor-Faktor Penyebab Change Order And Pengaruhnya yang Dominan Terhadap Kinerja Biaya Pelaksanaan Proyek Konstruksi di Lingkungan Pemerintah Provinsi Maluku Utara, J. Ilmiah Media Engineering, 3 (1), p. 42, (2013) [Google Scholar]
- Sugiyono, Statistika untuk Penelitian, Penerbit CV. Alfabeta, Bandung (2015) [Google Scholar]
- A. L. Olupitan, U. O. Ajator, O. P. Nzeneri, The Critical Causes and Effects of Cost Overruns in Public Sector Construction Projects in Port Harcourt Nigeria, International Journal of Scientific and Research Publications, 11(10) (2021) http://dx.doi.org/10.29322/IJSRP.11.10.2021.p11835 [Google Scholar]
- W. Xie, B. Deng, Y. Yin, X. Lv, X. Z. Deng, Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation. Buildings, 12 2028 (2022) https://doi.org/10.3390/buildingsl 2112028 [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.