Open Access
Issue
E3S Web Conf.
Volume 584, 2024
Rudenko International Conference “Methodological Problems in Reliability Study of Large Energy Systems” (RSES 2024)
Article Number 01023
Number of page(s) 4
DOI https://doi.org/10.1051/e3sconf/202458401023
Published online 06 November 2024
  1. Krupenev D.S. Development of methodological foundations for the analysis of system reliability of modern electric power systems. Reliability and safety of energy. 2024, No. 2, pp. 114-121. (in Russian) [Google Scholar]
  2. Krupenev, D.S., Domyshev, A.V. Assessment of the operational reliability of electric power systems based on the Monte Carlo method Electricity, 2015, No. 2. - pp. 4-12. (in Russian) [Google Scholar]
  3. Kovalev G.F., Lebedeva L.M. Reliability of electric power systems. Novosibirsk:Nauka, 2015. (in Russian) [Google Scholar]
  4. Chukreev Yu.Ya., Chukreev M.Yu. Models for assessing balance reliability indicators in managing the development of electric power systems. - Syktyvkar:Komi Scientific Center of the Ural Branch of the Russian Academy of Sciences, 2014, 207 p. (in Russian) [Google Scholar]
  5. Roy Billinton, Wenyuan Li Reliability Assessment of Electric Power Systems Using Monte Carlo Methods. Springer New York, NY, 1994, 352 p. [Google Scholar]
  6. Mogirev V.V. Algorithm and program for calculating reliability indicators of electric power systems using the statistical modeling method (the “Potok” program). // Methodological issues in studying the reliability of large energy systems. Issue 4. Irkutsk:SEI SB RAS USSR, 1975. Pp. 2435. (in Russian) [Google Scholar]
  7. R.A. González-Fernández, A.M. Leite da Silva Reliability assessment of time-dependent systems via sequential cross-entropy Monte Carlo simulation. IEEE Trans. Power Appar. Syst., 26 (4) (2011), pp. 2381-2389 [CrossRef] [Google Scholar]
  8. R. Billinton, P. Wang Distribution system reliability cost/worth analysis using analytical and sequential simulation techniques. IEEE Trans. Power Appar. Syst., 13 (4) (1998), pp. 1245-1250 [CrossRef] [Google Scholar]
  9. S. Choudhury Review of energy storage system technologies integration to microgrid:types, control strategies, issues, and future prospects. J. Energy Storage, 48 (2022) [Google Scholar]
  10. Krupenev D.S., Boyarkin D.A., Yakubovsky D.V. Formation of power equipment repair schedules based on planned reliability indicators in long-term planning of electric power systems. In the collection:Methodological issues of studying the reliability of large power systems. Proceedings of the 95th meeting of the International Scientific Seminar. Irkutsk, 2023. pp. 117-124. (in Russian) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.