Open Access
Issue |
E3S Web Conf.
Volume 592, 2024
International Scientific Conference Energy Management of Municipal Facilities and Environmental Technologies (EMMFT-2024)
|
|
---|---|---|
Article Number | 05003 | |
Number of page(s) | 8 | |
Section | Mining, Geology, Geodesy, and Environmental Monitoring | |
DOI | https://doi.org/10.1051/e3sconf/202459205003 | |
Published online | 20 November 2024 |
- Azizi Arbain et al., Civil and environmental engineering reports 29(3), 048–059 (2019) https://doi.org/10.2478/ceer-2019-0023. [CrossRef] [Google Scholar]
- Ravindra Vipparthy, Static and free vibration analysis of gravity dam under the influence of hydrostatic pressure using ANSYS finite element models (GMRIT JNTUK. 2022 1) https://doi.org/10.21203/rs.3.rs-1823407/v. [Google Scholar]
- Sayantan Chakraborty et al., Engineering Geology 248(8), 340–345 (2019) https://doi.org/10.1016/j.enggeo.2018.12.00. [Google Scholar]
- E Lo L Pelecanos Andrew Pepper, ICE Publ. is part Inst. Civ. Eng. 1–11 (2018) https://doi.org/10.1680/sdar.64119.103. [Google Scholar]
- Bariş Sevim, Ahmet Can Altunisik. Civ. eng. res. j. 3(5), 1–12 (2018) https://doi.org/10.19080/CERJ.2018.03.55562. [Google Scholar]
- Z. Urazmukhamedova et al., J. Phys.: Conf. Ser. 2070, 012156 1–10 (2021) https://doi.org/10.1088/1742-6596/2070/1/01215. [CrossRef] [Google Scholar]
- Paolo Zimmaro, Ernesto Ausilio, Geosciences 10(499), 1–11. (2020) https://doi.org/10.3390/geosciences1012049. [PubMed] [Google Scholar]
- Ahmet Altunisik. et al.. Natural & Applied sciences journal 4(1), 22–29 (2021) https://doi.org/10.38061/idunas.85185. [CrossRef] [Google Scholar]
- G.L. Kozinetc, P.V. Kozinetc, Magazine of Civil Engineering 113(5), 1–8 (2022) https://doi.org/10.34910\MCE.113.1. [Google Scholar]
- M.M. Mirsaidov, E.S. Toshmatov, AIP Conference Proceedings 2791, 040007 (2023) https://doi.org/10.1063/5.014350. [CrossRef] [Google Scholar]
- M.M. Mirsaidov, E.S. Toshmatov, E3S Web of Conferences 376, 01103 (2023) [CrossRef] [EDP Sciences] [PubMed] [Google Scholar]
- H. Wang, L. Wang, Y. Song, J. Wang, Construction and Building Materials 112, 222–231 (2016) https://doi.org/10.1016/i.conbuildmat.2016.02.09. [CrossRef] [Google Scholar]
- S. Kumar, A.K. Sahu, M. Kumar, Ain Shams Eng. J. 2022, 13, 101510. [CrossRef] [Google Scholar]
- Vasoya, K.; Soni, N. Seepage Analysis of Core Section of Jhuj Dam. Int. J. Res. Appl. Sci. Eng. Technol. 10, 713–717 (2022) [CrossRef] [Google Scholar]
- Guidelines for determining loads and impacts on hydraulic structures (wave, ice loads and loads from ships) (SNiP 11-57-75). - L.: VNIIG im. Vedeneyev, 1977.-316 p. [Google Scholar]
- Guidelines for considering seismic impacts in the design of hydraulic structures (SNiP II-A.12-75). - L.: VNIIG im. Vedeneyev, 1977. - 164 p. [Google Scholar]
- ShNK 2.06.11-04 Construction in seismic areas. Hydraulic structures. Goskomarchitekstroy, 2004, Tashkent, 54 p. [Google Scholar]
- K. Salyamova, K. Toshmatov, N. Nishonov, E. An, E3S Web of Conferences 431, 03008 (2023). https://doi.org/10.1051/e3sconf/20234310300. [CrossRef] [EDP Sciences] [Google Scholar]
- K. Salyamova, E. An, N. Nishonov, K. Toshmatov, K. Turdikulov, E3S Web of Conferences 462, 02050 (2023) https://doi.org/10.1051/e3sconf/20234620205. [CrossRef] [EDP Sciences] [Google Scholar]
- O.K. Zenkevich, Finite element method in engineering. (Moscow, Mir, 1975) [Google Scholar]
- M.M. Mirsaidov, A.M. Godovannikov, Seismic resistance of structures. (Tashkent, "Uzbekistan", 2008) [Google Scholar]
- A. Yangiev, K. Salyamova, K. Turdikulov, X. Fayziev, IOP Conf. Series: Materials Science and Engineering 869, 072005 (2020) https://doi.org/10.1088/1757-899X/869/7/07200. [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.