Open Access
Issue |
E3S Web Conf.
Volume 486, 2024
IX International Conference on Advanced Agritechnologies, Environmental Engineering and Sustainable Development (AGRITECH-IX 2023)
|
|
---|---|---|
Article Number | 06009 | |
Number of page(s) | 10 | |
Section | Agricultural Mechanization, Civil Engineering and Energetics | |
DOI | https://doi.org/10.1051/e3sconf/202448606009 | |
Published online | 07 February 2024 |
- Z.K. Petrova, Fundamentals of the development of low-rise urban planning: monograph (Moscow, 2013) [Google Scholar]
- Yu. Bocharov, Z. Petrova, Priorities for the development of low-rise buildings in Russian urban planning. Fundamental, search and applied research of the RAASN on scientific support for the development of architecture, urban planning and the construction industry of the Russian Federation in 2017 1 (ASV, Moscow, 2018), pp. 310–314 [Google Scholar]
- A. Repin, Transport Business of Russia 1, 12–15 (2015) [Google Scholar]
- Z. Petrova, V. Dolgova, Academia, Architecture and Construction 2, 115–125 (2018) [Google Scholar]
- A. Teryagova, V. Salova, Architectural and urban planning aspects of the formation of a low-rise residential environment for the “Society of all ages” in the Samara region, in A collection of articles of the 79th All-Russian Scientific and Technical Conference, Samara, Russia, pp. 229–237 (2022) [Google Scholar]
- N. Klevanskiy, L. Voloshchuk, Centralized multi-project planning of low-rise development of rural areas, in Nikon readings, pp. 348–352 (2019) [Google Scholar]
- N. Klevanskiy, A. Krasnikov, Fundamental Research 2-3, 482–486 (2016) [Google Scholar]
- N. Klevanskiy, Journal of Advanced Research in Technical Science 6, 70–75 (2017) [Google Scholar]
- T.R. Browning, A.A. Yassine, International Journal of Production Economics 126 (2), 212–228 (2010) [CrossRef] [Google Scholar]
- V.M. Dalfard, V. Ranjbar, Tehnički vjesnik 19 (3), 493–499 (2012) [Google Scholar]
- R.K. Chakrabortty, R.A. Sarker, D.L. Essam, Resource Constrained Multi-project Scheduling: A Priority Rule Based Evolutionary Local Search Approach. In: Leu, G., Singh H., Elsayed S. (eds) Intelligent and Evolutionary Systems. Proceedings in Adaptation, Learning and Optimization 8 (Springer, Cham, 2017), pp. 75–86. [CrossRef] [Google Scholar]
- A. Singh, Resource Constrained Multi-Project Scheduling with Priority Rules & Analytic Hierarchy Process, in Proc. of 24th DAAAM International Symposium on Intelligent Manufacturing and Automation, 2013, Procedia Engineering 69, 725–734 (2014) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.