Open Access
Issue |
E3S Web Conf.
Volume 563, 2024
International Conference on Environmental Science, Technology and Engineering (ICESTE 2024)
|
|
---|---|---|
Article Number | 02011 | |
Number of page(s) | 8 | |
Section | Civil Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202456302011 | |
Published online | 30 August 2024 |
- G. Min, H. Shengyue, Research on Influencing Factors of BIM Application in China's Construction Industry -Based on Factor Analysis. Journal of Engineering Management 33(04), 38–42 (2019) [Google Scholar]
- V. Holubava, Smart cities and smart buildings: current condition and economic efficiency. Trudy BGTU 5(1), 65–72 (2019) [Google Scholar]
- Zhu Hailong, Tang Yuanwen, Research on dynamic control of cost in construction phase of engineering projects based on BIM. Value Engineering 35(24), 71–74 (2016) [Google Scholar]
- Jingna Liu, Research on cost management of construction project construction phase based on BIM. Shandong University, Jinan (2017) [Google Scholar]
- Wang Jun, Fang Jitao, Research on the application of BIM technology in the cost control of construction phase. Construction Economy 37(12), 65–67 (2016) [Google Scholar]
- Xianpeng Wang, Zhimin Ju, S.N. Kovshar, S.N. Leonovich, N.A. Solopova, The use of non-metallic fiber in the protection of building materials and its impact on the environment. Construction economics 7, 86–91 (2023) [Google Scholar]
- Yan Shi, Research on cost management mode of project implementation stage based on BIM. Journal of Engineering Management 32(04), 149–153 (2018) [Google Scholar]
- J.Y. Xue, P. Tan, F.M. Meng, Research on the application of BIM and earned value method in construction progress and cost control. Construction Economy 40(06), 115–119 (2019) [Google Scholar]
- Deng Yi et al., Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation. Computational Intelligence and Neuroscience 2021, 21–21 (2021) [Google Scholar]
- T.H. Tulchinsky, E.A. Varavikova, Measuring, Monitoring, and Evaluating the Health of a Population. The New Public Health 2014, 91–147 (2014) [CrossRef] [Google Scholar]
- Z. Tang, An integrated approach to evaluating the coupling coordination between tourism and the environment. tourism Manag. 46, 11–19 (2016) [Google Scholar]
- Wang Xianpeng, BIM informatization construction organization management-taking Hainan lingshui xiangshuiwan apartment construction project as example. Belarusian national technical University, Minsk 19–25 (2022) [Google Scholar]
- X. Huang, Application of BIM big data in construction engineering cost. Journal of Physics: Conference Series. IOP Publishing 1865(3), 032016 (2021) [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.