Open Access
| Issue |
E3S Web Conf.
Volume 656, 2025
2025 6th International Conference on Urban Engineering and Management Science (ICUEMS 2025)
|
|
|---|---|---|
| Article Number | 01007 | |
| Number of page(s) | 6 | |
| Section | Urban Infrastructure and Safety | |
| DOI | https://doi.org/10.1051/e3sconf/202565601007 | |
| Published online | 30 October 2025 | |
- VIOLANTE, A, DOMINGUEZ, C, PAIVA, A. Risk management in construction projects: are small companies prepared [J]. MOJ Civil Engineering, 2018, 4(1): 1–7. [Google Scholar]
- Monghasemi Shahryar, Nikoo Mohammad Reza, Fasaee MohammadAliKhaksar, Adamowski, Jan. A novel multi criteria decision making mode1 foroptimizing time-cost-quality trade-off problems in construction projects [J]. Expert Systems with Application, 2015, 42(6):3089-3104. [Google Scholar]
- Ma Ying. Analysis of Risks and Countermeasures in the Safety Management of Expressway Engineering [J]. Transport Manager World, 2025, (02):130-132. [Google Scholar]
- Fan Zhuanjing, Li, Jun. Research on Safety Management Strategies for Expressway Tunnel Construction [J]. Theoretical research on urban construction, 2024, (31):61-63. [Google Scholar]
- Hu, Wen. Comparison and selection of Pipe Jacking construction failure Handling Schemes Based on the Analytic Hierarchy Process [J]. Guangdong Building Materials, 2025, 41(06):149-152. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.

