Open Access
Issue
E3S Web Conf.
Volume 663, 2025
12th International Gas Turbine Conference “Advancing Turbomachinery Innovations and Strategies for Net-Zero Pathways” (IGTC 2025)
Article Number 01018
Number of page(s) 11
DOI https://doi.org/10.1051/e3sconf/202566301018
Published online 13 November 2025
  1. K. Brun, P. Friedman, R. Dennis, Fundamentals and Applications of Supercritical Carbon Dioxide (sCO2) Based Power Cycles, Elsevier ltd, 2017 [Google Scholar]
  2. D. Hofer, “Phased Development of a High Temperature sCO2 Power Cycle Pilot Test Facility”, 5th International Symposium Supercritical CO2 Power Cycles, March 28–31, 2016, San Antonio, TX. [Google Scholar]
  3. K.J. Kimball, and E.M. Clementoni, “Supercritical Carbon Dioxide Brayton Power Cycle Development Overview,” Proceedings of the ASME Turbo Expo, Copenhagen, Denmark, June 11–15, 2012 [Google Scholar]
  4. T.S. Conboy, T.S. Wright, J. Pasch, D. Fleming, and R. Fuller, “Performance Characteristics of an Operating Supercritical CO2 Brayton Cycle,” Proceedings of the ASME Turbo Expo, Copenhagen, Denmark, June 11–15, 2012. [Google Scholar]
  5. https://www.energy.gov/eere/solar/concentrating-solar-thermal-power [Google Scholar]
  6. J.J. Moore, N. Evans, K. Brun, C. Kalra, 2015, “Development of 1 MWe Supercritical CO2 Test Loop,” Proceedings of the ASME Turbo Expo, Paper #GT2015-43771, June 15–19, 2015, Montreal, Quebec, Canada. [Google Scholar]
  7. Moore, et al, “Development of a 1 MWe Supercritical CO2 Brayton Cycle Test Loop”, 4th International sCO2 Power Cycles Symposium, Pittsburgh, PA, 2014 [Google Scholar]
  8. J.J. Moore, S. Cich, M. Day-Towler, J. Mortzheim, 2020, “Development and Testing of a 10 MWe Supercritical CO2 Turbine in a 1 MWe Flow Loop,” GT2020-13894, Proceedings of the ASME 2020 Turbo Expo Turbomachinery Technical Conference & Exposition, Virtual, June 22–26, 2020. [Google Scholar]
  9. GTI Energy “STEP Demo Pilot Achieves Phase 1 Testing Milestone, Paving the Way for NextGeneration Supercritical CO2 Power Production” News & Events, October 2024. https://www.gti.energy/step-demo/achieves-phase-1-testing-milestone/ [Google Scholar]
  10. J. Marion, W. Follett, “A Step Forward for sCO2 Power Cycles”, Modern Power Magazine, pg 14–18, Nov/Dec 2023 [Google Scholar]
  11. J. Marion, S. Macadam, A. McClung, J. Mortzheim, “The STEP 10 MWe sCO2 Pilot Demonstration Status Update”, GT2022-83588, Proceedings of ASME Turbo Expo 2022 Turbomachinery Technical Conference and Exposition, June 13–17, 2022, Rotterdam, The Netherlands [Google Scholar]
  12. J. Marion, B. Lariviere, A. McClung, J. Mortzheim, “The STEP 10 MWe sCO2 Pilot Demonstration Status Update”, GT2021-58981, Proceedings of ASME Turbo Power Expo 2021 virtual conference, [Google Scholar]
  13. J. Marion, B. Lariviere, A. McClung, J. Mortzheim, R. Ames, “The STEP 10 MWe sCO2 Pilot Demonstration Status Update”, GT2020-14334, Proceedings of ASME Turbo Power Expo 2020 Turbomachinery Technical Conference and Exposition, June 22–26, 2020, London, England [Google Scholar]
  14. J. Marion, M. Kutin, A. McClung, J. Mortzheim, R. Ames, “The STEP 10 MWe sCO2 Pilot Plant Demonstration”, GT2019-91917, Proceedings of ASME Turbo Power Expo 2019 Turbomachinery Technical Conference and Exposition, June 17–21, 2019, Phoenix, Arizona [Google Scholar]
  15. J. Klaerner, J. Moore, K. Robinson, J. Wade, A. McClung, 2023, “Manufacturing and Hydro Testing of a 10 MWe SCO2 Axial Turbine, Proceedings of ASME Turbo Expo 2023, Turbomachinery Technical Conference and Exposition, GT2023-103135, June 26–30, 2023, Boston, Massachusetts [Google Scholar]
  16. S. Cich, J. Moore, K. Hoopes, M. Marshall, D. Hofer, J. Mortzheim, “Radial Inlet and Exit Design for a 10 MWe sCO2 Axial Turbine”, GTI2019-90392, Proceedings of ASME Turbo Power Expo 2019 Turbomachinery Technical Conference and Exposition, June 17–21, 2019, Phoenix, Arizona [Google Scholar]
  17. J.J. Moore, J. Klaerner, J. Wade, J. Mortzheim, G. Jothiprasad, 2024, “STEP 10 MWe SCO2 Turbine Design, Assembly, and Commissioning,” The 8th International Supercritical CO2 Power Cycles Symposium February 27 – 29, 2024, San Antonio, Texas, Paper #105 [Google Scholar]
  18. J.J. Moore, J. Klaerner, J. Wade, J. Mortzheim, G. Jothiprasad, 2024, “STEP 10 MWe sCO2 Turbine Commissioning,” GT2024-129200, Proceedings of ASME Turbo Expo, June 24–28, 2024, London, England, UK [Google Scholar]
  19. J. Moore, J. Marion, S. Pierre, J. Wade, 2025, “Commissioning and Testing of the STEP 10 MWe SCO2 Power Plant in Simple Recuperated Cycle Configuration”, Proceedings Turbomachinery & Pump Symposia, Houston, TX, September 2025 [Google Scholar]
  20. J. Mortzheim, D. Hofer, S. Priebe, A. McClung, J. J. Moore, and S. Cich, Challenges with measuring supercritical CO2 compressor performance when approaching liquid-vapor dome, ASME Paper, No. GT2021-59527, 2021 [Google Scholar]
  21. J.J. Moore, S. Cich, J. Neveu, J. Klaerner, J. Mortzheim, 2022, “Mechanical and Rotordynamic Test Results of a Supercritical CO2 Compressor Operating Near the Critical Point,” The 7th International Supercritical CO2 Power Cycles Symposium Feb 21 – 24, 2022, San Antonio, Texas, [Google Scholar]
  22. M. Kutin, J. Warren, Y. Chiu, 2024, “Commissioning and Simple Cycle Testing of the STEP Main Compressor,” The 8th International Supercritical CO2 Power Cycles Symposium February 27 – 29, 2024, San Antonio, Texas, Paper #105 [Google Scholar]
  23. D. Hino “Simple Cycle Test Validation of the STEP Dynamic Simulation Model”, The 8th International Supercritical CO2 Power Cycles Symposium February 27 – 29, 2024, San Antonio, Texas, Paper #105 [Google Scholar]
  24. M. Huang, C.J. Tang, A. McClung, (2018) “Steady state and Transient Modeling for the 10 MWe SCO2 Test Facility Program”, Proc. 6th International Symposium Supercritical CO2 Power Cycles, Pittsburgh, PA. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.