Open Access
Issue
E3S Web Conf.
Volume 685, 2026
International Seminar on Livable Space (IS-LiVaS 2025)
Article Number 04002
Number of page(s) 11
Section Creation Process of Livable-Space
DOI https://doi.org/10.1051/e3sconf/202668504002
Published online 14 January 2026
  1. F. Abdullah, A.N.Z. Sanusi, M.R.A. Razak, N. Asif, Z.B. Yusof, A.K. Azmin, M.N. Ismail, Utilisation of augmented reality for generating active learning in architectural education. J. Archit. Plan. Constr. Manag. 15, 128–137 (2025). [Google Scholar]
  2. Z.M. Udin, A.A. Othman, A. Ahmad, Supply chain technology utilization in Malaysia construction industry. J. Teknol. (Sciences Eng. 77 (2015). [Google Scholar]
  3. M.R. Hallowell, Risk-based framework for safety investment in construction organizations. J. Constr. Eng. Manag. 137, 592–599 (2011). [Google Scholar]
  4. M.R. Altaie, M.M. Dishar, Integration of Artificial intelligence applications and knowledge management processes for construction projects management. Civ. Eng. J. 10, 738–756 (2024). [Google Scholar]
  5. R. Miettinen, S. Paavola, Beyond the BIM utopia: Approaches to the development and implementation of building information modeling. Autom. Constr. 43, 84–91 (2014). [Google Scholar]
  6. T.D. Oesterreich, F. Teuteberg, Understanding the implications of digitisation and automation in the context of Industry 4.0: A triangulation approach and elements of a research agenda for the construction industry. Comput. Ind. 83, 121–139 (2016). [CrossRef] [Google Scholar]
  7. A.E. Eid, G. Hayder, H. Alhussian, Applications of Intelligent models in processes in the construction industry: Systematic literature review. Processes 13, 2866 (2025). [Google Scholar]
  8. M.A. Aziz, C.F. Wong, N.A. Haron, A.H. Ales, R.A.A.R.A. Effendi, O.K. Tan, Critical success factors for Building Information Modelling (BIM) implementation for power plant projects in Malaysia. IIUM Eng. J. 23, 34–45 (2022). [Google Scholar]
  9. N.A. Azmi, N.A.A. Ismail, A.F. Rosman, The adoption and impact of Building Information Modelling (BIM) towards Facilities Management (FM) in Malaysia. Malaysian J. Sustain. Environ. 11, 241–266 (2024). [Google Scholar]
  10. B. Becerik-Gerber, F. Jazizadeh, N. Li, G. Calis, Application areas and data requirements for BIM-enabled facilities management. J. Constr. Eng. Manag. 138, 431–442 (2012). [Google Scholar]
  11. W.I. Enegbuma, G.U. Aliagha, K.N. Ali, Effects of perceptions on BIM adoption in Malaysian construction industry. J. Teknol. (Sciences Eng. 77 (2015). [Google Scholar]
  12. I.H. Ibrahim, S.F. Tuanku Karim, N.A.A. Ismail, S.Z.H. Syed Jamaludin, Adopting building information modelling (BIM) into industrialised building system (IBS) in Malaysian construction industry. J. Smart Sci. Technol. 2, 40–51 (2022). [Google Scholar]
  13. C.M. Eastman, BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors (John Wiley & Sons, 2011). [Google Scholar]
  14. S.R. Sahamir, N.A.A. Ismail, R.R.R.M. Rooshdi, Z.M. Zainordin, Barriers impeding the adoption of Information and Communication Technology (ICT) in construction project management. Int. J. Integr. Eng. 13, 211–219 (2021). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.