Increasing safety at rock preparation by blasting in open pits
1
T. F. Gorbachev Kuzbass State Technical University, 650000 Kemerovo, 28 Vesennya st., Russian Federation
2
JSC NMZ Iskra, Novosibirsk, Russia
* Corresponding author: noa-0025@yandex.ru
The topicality of the present work lies in justification of the means of increasing safety during mass explosions in opencasts. The solution to this problem is possible due to the orientation of downholes in the array, taking into account the angle of incidence and extension of the strata, high-quality stemming and initiation of downhole charges by delay detonators with a minimal deviation from nominal values of their firing time. The most promising way to increase the safety and efficiency of blasting is an integrated approach, including drilling downholes, normal to the strata, and using the design of the downhole charge, rationally distributing the explosion energy in the space of the rock mass due to the use of stemming of a variable density, low-density gap between the parts of the explosive charge and the bottom a downhole compensator based on foam gel and the use of hybrid electronic detonator Iskra-T.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.