High speed power generator for low power steam turbine
1
Rostov State Transport University, Rostov-on-Don, Russian Federation.
2
Platov South-Russian State Polytechnic University (NPI), Novocherkassk, Russian Federation
3
Russian Energy Agency, Russian Federation
4
Federal State Budgetary Institution of Higher Education “Kazan State Power Engineering University”, Kazan, Russian Federation
* Corresponding author: kolpahchyan@mail.ru
The paper discusses the issues of creating a high-speed power generator for a low-power steam turbine. A 50 kW power generator with a rated speed of 12,000 rpm was developed. The influence of control parameters on the power generator performance was analyzed. The electromagnetic processes in the power generator were mathematically modeled. For the single-pulse control algorithm used in the generation mode, rational ratios of the angles of the beginning and end of the voltage pulse were established. The analysis of the obtained results shows that the developed power generator meets the set requirements for joint operation with a steam turbine. The choice of a valve-inductor machine for this purpose makes it possible to significantly simplify the design, reduce the costs of production and improves the reliability of the system as a whole. The peculiarities of the implementation of control algorithms make it possible to use a minimum number of sensors and not to use the rotor position sensor.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.