Issue |
E3S Web Conf.
Volume 233, 2021
2020 2nd International Academic Exchange Conference on Science and Technology Innovation (IAECST 2020)
|
|
---|---|---|
Article Number | 01036 | |
Number of page(s) | 4 | |
Section | NESEE2020-New Energy Science and Environmental Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202123301036 | |
Published online | 27 January 2021 |
Feasibility study on adjustment of injection-production system in extremely high water cut period
The 3rd Oil Production Factory, Daqing Oil Field Company Ltd, Daqing, China
a Corresponding author: gqcao_dq@petrochina.com.cn
Entering the stage of ultra-high water cut development, affected by faults and irregular well patterns in some areas, there are problems in the development of oilfields such as imperfect injection-production systems, high oil-water wells ratio, low multi-directional connectivity ratio, and complex injection-production relationships. To this end, combined with well seismic and fine reservoir research results, the feasibility study of the injection-production system adjustment was carried out, based on the fine adjustment of the strata well pattern, and through new drilling, supplementary drilling, re-injection, re-production, etc. The well pattern connection rules are conducive to the purpose of adjustment, thereby increasing the recovery rate and improving the effect of oilfield development.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.