Issue |
E3S Web Conf.
Volume 8, 2016
Mineral Engineering Conference MEC2016
|
|
---|---|---|
Article Number | 01030 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/e3sconf/20160801030 | |
Published online | 16 September 2016 |
Influence of flotation cell volume and solids mass on kinetics of sulfide ore flotation
Wroclaw University of Science and Technology, Faculty of Geoengineering, Mining and Geology, Wybrzeze Wyspianskiego 27, 50-370 Wroclaw, Poland
a Corresponding author: michal.plawski@op.pl
The paper presents studies on the influence of flotation cell capacity and mass of solids in the suspension on the flotation kinetics of sulfide copper ore. A sample of copper ore that was collected from the Polkowice Mine of KGHM Polska Miedz S.A. in Poland was used in the experiments. It was determined that neither the volume of flotation cell nor the mass of solids had influence on the type of kinetics equation of flotation. Copper-bearing minerals floated according to the second-order equation, while the remaining components according to the first-order equation. The kinetic rate constants and maximum recovery of the studied components decreased with increasing solids mass in the flotation cell, regardless of the capacity of the cell. The best results were obtained for tests using a 1.0 dm3 cell, while the less favorable kinetics results were observed in the test with the smallest cell of 0.75 dm3 volume. The obtained results can be helpful in choosing the most appropriate methodology of upgrading the sulfide copper ore from Poland in order to obtain the best kinetics results.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.