Issue |
E3S Web Conf.
Volume 40, 2018
River Flow 2018 - Ninth International Conference on Fluvial Hydraulics
|
|
---|---|---|
Article Number | 03036 | |
Number of page(s) | 8 | |
Section | Hydraulic structures and their effects on bed, flow regime and ecology | |
DOI | https://doi.org/10.1051/e3sconf/20184003036 | |
Published online | 05 September 2018 |
Impact Analysis of Sand Dredging from Alluvial Tidal River
1
Dept. of Environmental, Water Resources and Coastal Engineering (EWCE), Military Institute of Science and Technology (MIST)-Mirpur Cantonment, Dhaka - 1216, Bangladesh
2
Institute of Water and Flood Management (IWFM), Bangladesh University of Science and Technology (BUET) - Dhaka, Bangladesh
* Corresponding author: numan.kibriya@gmail.com
The Government of Bangladesh has planned to make a large build up area (BUA) in a newly developed sedimentary point bar (locally known as ‘Char’) at Lebukhali along the northern bank of Payra river in the southern part of the country. From a study it was revealed that, this sedimentary bar has to be raised by 3.45 meters from MSL to keep it free from any extreme events (like tidal and storm surge effects) for 100 years return period. Accordingly, it was planned to collect the required filling material (estimated 57.6 million m3 of sand/soil) by dredging the same river bed. In Bangladesh dredging of river is very popular and widely undertaken to collect filling and construction material, but its adverse impact on river bed, bank and adjacent areas are hardly probed. This study aimed at analyzing the adverse impacts of dredging from Payra River bed. Four alternative sand bars have been identified as dredging area at varying distances located both upstream and downstream of the proposed site. The dredging impacts were analyzed for different boundary conditions. The study is based on physical survey (topographic and bathymetric surveys), historical data and numerical model analysis. Numerical model is applied through Delf 3D to investigate the impact on flow parameters: flood depth and velocity magnitude. Continuous field visit and observations were made through last one year to observe real impact. The analysis revealed that dredging of any of the bars have resulted changes in flow field. The distance of dredging point does not control the flow field rather the dredging volume, depth and upstream conditions determine the effect on bank erosion. As such, the dredging locations have been prioritized considering the least possible effects on river bank erosion and founded that little erosion is taking place for both upstream and downstream region. However, the long term impacts in other areas of the river need to be investigated as the time pass.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.