Issue |
E3S Web Conf.
Volume 53, 2018
2018 3rd International Conference on Advances in Energy and Environment Research (ICAEER 2018)
|
|
---|---|---|
Article Number | 03021 | |
Number of page(s) | 3 | |
Section | Environment Engineering, Environmental Safety and Detection | |
DOI | https://doi.org/10.1051/e3sconf/20185303021 | |
Published online | 14 September 2018 |
Research on planning and design strategy of Gully Ecology Park—Take Shanxi's Northern gully Park as an example
College of Architect and Civil Engineering,Taiyuan University of Technology, Taiyuan 030024, China
* Corresponding author: liurongrong0391@link.tyut.edu.cn
The Li Cheng Northern gully Central Park is located between the new and old city of Li Cheng county, Changzhi city, Shanxi province. It is the link between the new and old urban areas and the ecological corridor of the central county. There are villages, water systems and abundant vegetation in the gully. Relying on the rich natural historical resources of the northern gully area, the leisure tourism service is developed, and the red cultural temperament of the area is combined to create a large green space central park, which integrates display, commemoration, sightseeing, rest, office and office. Based on the general idea of “water moisten garden, green shade garden and cultural nourish garden”, we plan to build a homestead rural for urban people.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.