Issue |
E3S Web Conf.
Volume 84, 2019
14th International Scientific Conference “Forecasting in Electric Power Engineering” (PE 2018)
|
|
---|---|---|
Article Number | 01005 | |
Number of page(s) | 12 | |
Section | Forecasting in Electric Power Engineering | |
DOI | https://doi.org/10.1051/e3sconf/20198401005 | |
Published online | 11 February 2019 |
Forecast and impact of electromobility development on the Polish Electric Power System
Warsaw University of Technology, Institute of Electrical Power Engineering, ul. Koszykowa 75, Gmach Mechaniki, Warszawa, Poland
* Corresponding author: jozef.paska@ien.pw.edu.pl
Thanks to the development of technology, the presence of electric vehicles (EVs) on the roads is no longer a purely theoretical issue. Also in Poland, electric cars are already visible on the streets, and charging stations (EVCS) are increasingly being installed near newly emerging buildings and housing estates. The article attempts to determine to what extent the use of electric cars will affect the demand for power and energy in the Polish electric power system (PEPS). The basis for PEPS modernization plans should be a detailed analysis of the technical adequacy of all its subsystems: generation, transmission and distribution, on the basis of which it will be possible to assess the potential impact of EVCS infrastructure operation on the Polish electric power system. This publication presents an example of such analysis for the distribution sub- sector, most exposed to potential negative interactions with the future, extensive infrastructure of EVCS.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.