Issue |
E3S Web Conf.
Volume 114, 2019
International Conference of Young Scientists “Energy Systems Research 2019”
|
|
---|---|---|
Article Number | 06004 | |
Number of page(s) | 9 | |
Section | Advanced Energy Technologies | |
DOI | https://doi.org/10.1051/e3sconf/201911406004 | |
Published online | 04 September 2019 |
Natural gas intracyclic attachment for energy generating unit based on gas turbine plant
1 Joint Institute for High Temperatures, Russian Academy of Sciences, Ijorskaia str. 13/2, Moscow, Russia
2 Bauman Moscow State Technical University, 2nd-Baumanskaia str. 5, Moscow, Russia
3 PJSC “ALMAZ R&P Corp.” LEMZ DIVISION, Dmitrovskoie route 110, Moscow, Russia
In this article, problems of effectiveness increasing in complex power supply are considered. Disadvantages of centralized power engineering and advantages of power engineering capabilities organization in immediate consumer proximity are presented. Consumer needs satisfaction in electricity, heat supply and cold supply are offered to be realized by conversion of district and quarter boiler houses to trigeneration stations, which are based on gas turbine plants units. In this research, solutions of problem related to lack of fuel gas pressure for gas turbine engine power, which is included in gas turbine plant of trigeneration stations, are suggested. As a result, after considering possible variants of fuel gas pressure increasing, it was decided that there is a perspective of using fuel gas intracyclic compression attachment. Its operating principle involves organization of main steam extraction in heat cycle for booster compressor drive, which compresses fuel gas before its transfer to combustor of gas turbine plant. Results of gas compressor and drive steam turbine design are presented. These parts are included in fuel gas intracyclic compression attachment in specific unit of gas turbine plant. Also, general recommendations about new compressor and turbine stages design for any other units of gas turbine plant are pointed. Further, in the article, two variants of thermal circuit, based on gas turbine plant, are suggested. The first one is a circuit with hot water boiler, where exhaust gas recuperation after turbine is carried out for producing steam, related to fuel gas intracyclic compression attachment demands, and heat system water heating for consumer heat supply system. The second variant involves development of typical gas turbine plant unit in power station with exhaust boiler. There fuel gas intracyclic compression attachment is activated by steam work after exhaust boiler. Then, variants of diagram are compared between each other. Also advantages and disadvantages each of them are considered.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.