Issue |
E3S Web Conf.
Volume 180, 2020
9th International Conference on Thermal Equipments, Renewable Energy and Rural Development (TE-RE-RD 2020)
|
|
---|---|---|
Article Number | 04008 | |
Number of page(s) | 10 | |
Section | Miscellaneous | |
DOI | https://doi.org/10.1051/e3sconf/202018004008 | |
Published online | 24 July 2020 |
The smart transition of Power Transmission Network needed for the sustainable development of Bucharest City
1
Associate Prof., Dept. of Energy Production and Use, University POLITEHNICA of Bucharest, Romania
2
PhD. Student, Dept. of Energy Production and Use, University POLITEHNICA of Bucharest, Romania
3
Professor, Dept. of Power Systems, University POLITEHNICA of Bucharest, Romania
4
Master Degree Student, Dept. of Energy Production and Use, University POLITEHNICA of Bucharest, Romania
* Corresponding author: mirceas1960@yahoo.com
Large cities around the world continue to grow larger. This is also the case of Bucharest, the capital city of Romania and one of the largest and most densely populated locations in Eastern Europe. In this article authors present an overview of the development of Bucharest as the largest electricity consumer amongst the Romanian municipalities and analyse possible solutions for the refurbishment of the HV (High Voltage) grid. This process needs to help the city development and its transition to a Smart City. At first authors present the strategy of local authorities for improving the living standard and decrease the environmental pollution. The impact of this strategy on the electrical energy demand is further analysed. Possible technologies are presented for substations and electrical lines starting from the current situation of the transmission network. All these can contribute to a decrease of the environmental impact and to an increase in the continuity of the power supply. Technical and economical evaluation of the refurbished grid is further presented along with a sensitivity analysis. The evaluation of the investment is made by taking into consideration the demand forecast. Lines and transformers are sized and chosen with the best available technology. For the economic analysis authors used criteria accepted by funding sources, banks especially, such as NPV and IRR. The sensitivity of the project economics is tested and discussed. As conclusions authors present the environmental benefits of gradually changing the technology used for electricity transmission in a large city such as Bucharest, mainly regarding land occupancy with switchgear and line routes and soil pollution.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.