Issue |
E3S Web Conf.
Volume 189, 2020
2020 International Conference on Agricultural Science and Technology and Food Engineering (ASTFE 2020)
|
|
---|---|---|
Article Number | 03035 | |
Number of page(s) | 4 | |
Section | Natural Resources and Environmental Studies | |
DOI | https://doi.org/10.1051/e3sconf/202018903035 | |
Published online | 15 September 2020 |
Study on Energy-saving Lighting Design Method for Interior Zone of High-altitude Highway Tunnel
College of Architecture and Urban-Rural Planning, Sichuan Agricultural University, Dujiangyan, Sichuan, China
* 602347502@qq.com
** 799504536@qq.com
*** 1936279109@qq.com
**** 1026501149@qq.com
***** 543312659@qq.com
****** 516226098@qq.com
******* 2597552996@qq.com
In order to ensure the driving safety of high-altitude highway tunnel and effectively reduce the lighting cost, this paper adopts the method considering the influence of automobile headlights luminance which combines reaction time incremental theory at different altitudes and lighting design simulation calculation. The paper has studied the design pattern of high-altitude highway tunnel, which are dominated by fixed lighting and supplemented by automotive lighting. The results show that: to ensure driving safety, the luminance of the lighting design for interior zone of highway tunnel increases with the increasing altitude. Based on the supplementary lighting of automobile headlights, the lighting design standards for the interior zone of high-altitude highway tunnel(the altitude is 2000m, 3000m, 4000m, 5000m respectively) are 0.73cd/m2, 0.82cd/m2, 0.91cd/m2, 1.0cd/m2.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.