Issue |
E3S Web Conf.
Volume 248, 2021
2021 3rd International Conference on Civil Architecture and Energy Science (CAES 2021)
|
|
---|---|---|
Article Number | 03052 | |
Number of page(s) | 7 | |
Section | Research on Civil Water Conservancy Engineering and Urban Architecture | |
DOI | https://doi.org/10.1051/e3sconf/202124803052 | |
Published online | 12 April 2021 |
Study on ventilation scheme and application during construction of high altitude gas tunnel
1 Qinghai Communications Construction Management Co, Ltd., Xining, Qinghai, 810003, China ;
2 China Merchants Chongqing Communication Research & Design Institute Co., Ltd., Chongqing 400067, China )
* Corresponding author: lightcheng@126.com
It is the key and difficult point to ensure the safety of tunnel construction by ventilation in high gas tunnel construction in high altitude and cold area. Taking ning-chan high gas tunnel as the research object, the ventilation of the tunnel is calculated, the ventilation parameters are optimized, the ventilation equipment is selected according to the calculation results, the location of the ventilation equipment is optimized, and the reasonable construction ventilation scheme is determined. The results show that through the design of the above ventilation scheme and the control of the site, it can not only ensure the ventilation demand of the super long and high gas tunnel construction in the high cold and high altitude area, but also ensure the tunnel construction in winter, and effectively save the construction ventilation cost.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.