Simulation of the newly-built temporary cofferdam stability under the regular wave condition
1 Tianjin Port Engineering Institute Co., Ltd. Of CCCC First harbor engineering Co., Ltd., Tianjin, 300222, China
2 CCCC First Harbor Engineering Company Ltd., Tianjin, China
3 Key Laboratory of Port Geotechnical Engineering, Ministry of Communications, PRC, Tianjin, China
4 Key Laboratory of Port Geotechnical Engineering of Tianjin, Tianjin, China
* Corresponding author’s e-mail: liuwenbin3943@163.com
The lateral cyclic wave force challenges the newly-built temporary cofferdam seriously. This paper simulated and assessed the movement of the plugged-in steel cylinder affected by the regular wave force with finite element method. The FEM analysis was conducted for an actual case, and the conclusions may show its advantages in the design work.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.