Assessment on the movement of the steel cylinder during the remove process
1 Tianjin Port Engineering Institute Co., Ltd. Of CCCC First harbor engineering Co., Ltd., Tianjin, 300222, China
2 CCCC First Harbor Engineering Company Ltd., Tianjin, China
3 Key Laboratory of Port Geotechnical Engineering, Ministry of Communications, PRC, Tianjin, China
4 Key Laboratory of Port Geotechnical Engineering of Tianjin, Tianjin, China
* Corresponding author: liuwenbin3943@163.com
The plugged-in steel cylinder plays a key role in building a fast quay wall of the man-made island. The installed steel cylinder will be partly removed to establish a better construction environment in practical cases. This paper analyzed the movement of plugged-in cylinder during remove stage with numerical simulation method. The data from a practical case was calculate to exhibit the analysis procedure.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.