Issue |
E3S Web Conf.
Volume 329, 2021
4th International Conference on Green Energy and Sustainable Development (GESD 2021)
|
|
---|---|---|
Article Number | 01004 | |
Number of page(s) | 4 | |
DOI | https://doi.org/10.1051/e3sconf/202132901004 | |
Published online | 09 December 2021 |
Load Forecasting of Distributed Energy in Industrial Park and Its Investment Linkage Analysis
1 State Grid Henan Economic Research Institute, Zhengzhou, China
2 Ohio State University, USA
* Corresponding author: chenxing@ha.sgcc.com.cn
Power grid enterprises are changing their function orientation and profit model under the background of new power system reform. Vector autoregressive model used for industrial park to forecast load of distributed energy is created in this paper, which provides the data to the analysis of the investment environment of grid enterprises. We excavate the core influencing factors of grid investment in incremental distribution parks based on the linkage of grid investment influencing factors in system dynamics.
Key words: Park / Incremental distribution / Investment impact / Linkage
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.